PACKAGING

The collector is packed in a carton box. All the parts of the support base system are packed in a carton box, if the 

installation needs so demand.

TRANSPORTATION AND HANDLING INSTRUCTIONS

Caution:

 the supporting base must be assembled before the installation of the collector.

The collector is packed in a cardboard box. During its transport and handling, all safety indications on the packaging 

should be respected. The packing materials must be removed from the collectors at the point of installation, so as 

to protect them from shocks, paying attention not to support the collectors on their pipe connections. When the 

packaging materials are removed the collectors must be placed directly onto their supporting base, which must be 

assembled according to the instructions in this leaflet.

FLAT SURFACE

INCLINED SURFACE

One type of supporting base 

system, electrostatically painted, 

made of 2.5mm thick galvanised 

steel, with stainless steel screws 

and nuts for installation on 

flat

 

or 

inclined surfaces

SUPPORT BASE

Normal absorber design with louvers

.

Air turbulence increases heat loss

Complete area technology

The uniform area prevents heat loss

Содержание Apollon Meander AL GRD MDR

Страница 1: ...Technical Manual Installation maintenance use instructions Solar collectors Meander AL GRD MDR ...

Страница 2: ......

Страница 3: ...R THE INTERCONNECTION OF COLLECTORS IN SOLAR FIELDS 7 RECOMMENDATIONS ON HEAT TRANSFER MEANS AND SAFETY AND PROTECTION MEASURES DURING FILLING OPERATION AND MAINTENANCE OF THE SYSTEM 7 MAXIMUM OPERATING PRESSURE PRESSURE DROP MAXIMUM AND MINIMUM ANGLE 8 GENERAL INSTALLATION RULES 9 INSTALLATION POSITION 10 GENERAL PREVENTION MEASURES 11 SUPPORT BASE PARTS 12 SUPPORT BASE ASSEMBLY ON A FLAT SURFACE...

Страница 4: ... least 40 litres daily In order to take full advantage of the solar water heater maximum use of hot water should be made during daytime so that the system can continuously produce hot water during the daylight hours maintaining thus its maximum efficiency SOLAR WATER HEATING The collecting surface absorbs solar energy and heats the liquid water or antifreeze mixture that circulates in the water el...

Страница 5: ...dow area as well as the headers thus increasing the collector s absorbency Laser Welded to the water frame 5 Special plastic parts for supporting and sealing the water frame to the trough specially designed for the collector s ventilation with sensor supporting option Special silicone rubber seals allow fluctuation of the absorber s length contraction expansion in a 40 C to 200 C temperature range...

Страница 6: ...rom the collectors at the point of installation so as to protect them from shocks paying attention not to support the collectors on their pipe connections When the packaging materials are removed the collectors must be placed directly onto their supporting base which must be assembled according to the instructions in this leaflet FLAT SURFACE INCLINED SURFACE One type of supporting base system ele...

Страница 7: ...table to provide frost protection down to 10 within the collector at an exterior temperature of 20 Once the system has been placed and until the installation is complete the glass panels of the collectors must remain covered until the boiler is filed with service water so as to avoid the boiling of the filling liquid or the breakage of the glass The system must have the filling liquid replaced or ...

Страница 8: ...maximum yield The solar system must be oriented so that the collecting surface faces the geographical south for the northern hemisphere and the geographical north for the southern hemisphere i e it should always face the equator Any deviation in the orientation means a drop in the system s performance If a deviation from the correct orientation cannot be avoided then the system s performance must ...

Страница 9: ...ons that apply As the sun ray s angle of attack varies with time but also depending on the system s location the collector s angle should be approximately equal to the installation location s latitude At this angle the maximum energy gain on an annual basis is achieved Installation particularities In case there is no compatibility between the surface where the collector will be installed inclined ...

Страница 10: ...tion make sure that the roof and or the construction is of adequate bearing capacity in terms of statics always according to the expected maximum loads at the installation point If the installation is in a place with an extremely big wind and snow load the system as a whole should be statically checked by a skilled person e g a specialized engineer In special cases strengthening or more solid cons...

Страница 11: ...ical devices and electrical tools against unintended activation y y Use only the tools intended to be used for this specific solar system The use of other components or inappropriate tools can cause accidents Requirements related to the personnel y y The installation of our Solar Thermal systems can only be undertaken by authorized specialized companies and trained personnel y y Works in electrica...

Страница 12: ...2 5 847 5 1151 5 1178 5 1190 3 0 10 110 815 915 925 4 0 14 754 1978 2018 2048 2060 89 2 0 20 920 940 44 140 295 645 800 896 5 0 15 55 490 925 965 980 6 0 300 1200 1500 42 392 1108 1458 1 3 2 5 0 13 173 213 308 1752 1847 1887 2047 2060 0 11 5 38 5 342 5 847 5 1151 5 1178 5 1190 0 10 110 815 915 925 4 0 14 754 1978 2018 2048 2060 89 0 15 55 490 925 965 980 6 ...

Страница 13: ...rew vertical part 3 to the above parts 3 Screw diagonal part 4 to the above parts and tighten all screws Repeat steps 1 2 3 for the other pairs of parts 4 Place parts 6 crosswise and tighten the screws 5 2 1 3 4 6 5 5 Screw the collector supporting part 5 to the bottom part of the frame and tighten the screws 6 Screw the collector supporting part 5 to the top part of the frame without tightening t...

Страница 14: ...bottom right edge Connect the pipe to the system s heat exchanger outlet 12 Place a Ø22 mechanically tightened copper plugs on the upper right and bottom left edge of the collector s 13 Place the intermediate decorative channel optionally clasp the piping covers and fasten up the plugs at the bottom part Use lock nuts in order to avoid the copper tube mechanical strain STEP 10 STEP 11 STEP 7 STEP ...

Страница 15: ...ape parts constructed in the former step 1 in order for the frame to be formed Screw straight parts 6 which will be used for the mounting of the support base to the tiles to the botton part Repeat for the rest of the parts 5 Bend the straight parts 6 of step 2 with the hand covering the beams of the tiled roof Drill and fasten up with bolts Use level so that the base is horizontally placed 3 Screw...

Страница 16: ...and the sensor slot at the upper left part of the collector Connect the pipe to the system s heat exchanger inlet 9 Place a 3 4 Ø22 mechanically tightened at the collector bottom right edge for the connection of the boiler line Connect the pipe to the system s heat exchanger outlet 10 Place a Ø22 mechanically tightened copper plugs on the upper right and bottom left edge of the collector s 11 Plac...

Страница 17: ... mains and to the consumption system inspection of the pipe insulation and cleaning of the glass y y If the collectors glass is broken it should be replaced immediately y y It is recommended that the glass is washed at an hour of low sunlight to avoid damages due to expansion contraction due to temperature changes y y If the fittings are worn screws pugs piping etc these should be replaced at the ...

Страница 18: ...erly insulated Has the installment on the roof been done according to the local regulations HYDRAULIC CONNECTIONS Are there any leaks in the closed circuit the connections or in the tube heat exchanger Are the safety valves installed properly Does a mixing valve of hot cold water exist ELECTRICAL CONNECTION Is the electric resistance connected properly if it exists Has the electric connection been...

Страница 19: ......

Страница 20: ...100 Sofia Region Bulgaria Tel 359 2 4210232 email info nobel bg 11 18 Solar collectors Meander AL GRD MDR The company preserves the right to change all specifications of the products and their accessories without prior notice The company preserves the right to change all specifications of the products and their accessories without prior notice ...

Отзывы: