Nobel 1000lt Скачать руководство пользователя страница 16

16

HYDRAULIC UNIT

It contains all the basic accessories required for the connection of the collectors to the buffer.

 

y

For the connection of the hydraulic unit to the solar circuit (collectors, system heat exchanger to the inferior part 

of the buffer) please refer to the hydraulic diagram of solar systems.

 

y

The connection of the expansion vessel to the safety valve of the solar hydraulic unit should have a maximum 

length of 2 meters, with no bends and no air accumulation points. The union nut should have a diameter of 3/4’’.

 

y

 After having connected the hydraulic unit, the closed loop should be cleaned. System cleaning is carried out with 

water for 15 minutes, by isolating the circulation pump with the two valves before and after, and by opening the 

two filling/evacuation valves. The valves for the connection of plastic pipes are male.

 

y

 Prior to filling the closed loop with the anti-freeze liquid it is necessary to check the sealing of all the connections. 

During the cleaning, for example, you can shut one of the two filling/evacuation valves and use a compression 

pump or water compression from the network to raise the pressure of the circuit to 5 bars for 15 minutes.

ATTENTION!

 The expansion tank has to be isolated to avoid surpassing the maximum operating pressure.

 

y

The mixing of the anti-freeze liquid must be carried out prior to the filling and at a ratio suitable to resist the 

minimum ambient temperature at which it is going to operate.

 

y

System filling may be executed either from the upper side of the collector by gravity or through the compression 

pump from the hydraulic unit. Operating pressure from 1.5 to 3 bars can be executed with pump filling or with the 

water compression from the network. Constantly check all ventilation points as you fill the circuit.

 

y

 All installations and the relative attachments have to conform to the current local regulations (electrical, hydraulic, 

building, sanitary etc.) in force.

 

y

 It is recommended to place a vessel under the hydraulic unit of a capacity suitable to collect the anti-freeze 

liquid that may run from the security valve. The presence of this vessel is particularly useful during the filling and 

ventilation phases or during hydraulic testing, as the valve opens at 6 bar.

CLOSED LOOP PIPING

 

y

All pipes starting from and resulting to collectors must by appropriately insulated in order to resist to temperatures 

from -30°C to +120°C. It is also necessary to protect insulating material from UV rays.

 

y

The thickness of insulation depends on the local climate conditions.

 

y

To minimize heat losses, the distance between collectors and the buffer heat exchanger must be the smallest 

possible. 

 

y

Avoid the concentration of air. If this is not possible, the installation of an automatic ventilator at the air accumulation 

point. concentration is necessary. 

 

y

Pipes diameter must be from Ø18mm to Ø22mm for distances up to 20 meters and Ø15mm for distances up to 

12 meters.

 

y

All the union nuts must resist compression 6 bar and temperatures from -30°C to +200°C. 

 

y

The annual check of the equipment and its connections is mandatory. 

HYDRAULIC UNIT DESCRIPTION 

Pumping, regulating, venting unit for forced circulation solar systems. In the hydraulic system, hydraulic balancing, 

flow measurement and venting can be performed directly in the station. The built-in SETTER Inline PF valve allows 

the required quantity of liquid in the primary circuit to be exactly and simply set and checked. The continuous venting 

system meets the most demanding requirements and keeps the system free of air. Systems which are air-free 

and correctly balanced hydraulically guarantee optimal energy efficiency, and are thus more cost-effective in the 

framework of the energy-saving directives laid down by law.

Using the scale, which is pre-calibrated for glycol, the technician can set and check the exact flow-rate values on-site. 

Neither training courses nor expensive measuring devices are required. Installation and venting can be carried out 

by one person working unaided.

Содержание 1000lt

Страница 1: ...Installation maintenance use instructions Buffer Water Tanks 160 1000 lt Technical Manual...

Страница 2: ......

Страница 3: ...ger BF2 11 GENERAL INSTALLATION RULES 12 INSTALLATION POSITION 13 GENERAL PREVENTION MEASURES 14 INSTRUCTIONS FOR THE INTERCONNECTION OF COLLECTORS IN SOLAR FIELDS 15 RECOMMENDATIONS ON HEAT TRANSFER...

Страница 4: ...imum use of hot water should be made during daytime so that the system can continuously produce hot water during the daylight hours maintaining thus its maximum efficiency SOLAR WATER HEATING The coll...

Страница 5: ...rbon dioxide emissions are reduced Central solar systems are made of excellent materials according to international specifications and have all the certificates and tests that attest their quality The...

Страница 6: ...e following table PACKAGING 1 Buffer 2 Collector s 3 Support base fittings Accessories 4 Hydraulic Unit 5 Palette 1 2 2 3 4 5 FITTINGS ACCESSORIES FITTING ACCESSORIES FOR COLLECTORS KIT FOR FC BUFFER...

Страница 7: ...are important for the future identification of the product When applied Capacity xxx lt Weight xxx kg Max working pressure xxx bar Max working temperature xxx C Lower heat exchanger surface S1 xxx m2...

Страница 8: ...onal internal coil type heavy duty steel type Tubo integrated in the upper part of the buffer tank for the connection of the secondary heating source y y Thermal insulation which minimises heat losses...

Страница 9: ...243 243 239 239 331 331 Sensor Level P2 mm 424 489 666 628 712 678 797 Sensor Level P3 mm 605 735 1088 1018 1184 1025 1262 Sensor Level P4 mm 786 981 1511 1407 1656 1372 1727 Thermometer L mm 786 981...

Страница 10: ...ernal Diameter D ext mm 600 600 600 700 700 990 990 Internal Diameter D int mm 500 500 500 600 600 850 850 Height HT mm 1035 1230 1760 1655 1900 1770 2100 Lower HE Outlet C mm 242 242 242 238 238 331...

Страница 11: ...990 External Diameter D ext mm 700 700 990 990 Internal Diameter D int mm 600 600 850 850 Height HT mm 1655 1900 1770 2100 Lower HE Outlet C mm 238 238 331 331 Lower HE Inlet D mm 778 913 878 1046 Up...

Страница 12: ...ION RULES ATTENTION Installation must be in compliance with local national rules concerning water and electrical installations plumbing electricity hygiene urban and others The solar system s packagin...

Страница 13: ...t may be the result of an inappropriate installation or incorrect use of components used for the solar water heater installation INSTALLATION POSITION The installation is only allowed on roofs and fla...

Страница 14: ...al systems can only be undertaken by authorized specialized companies and trained personnel y y Works in electrical installations or conductors have to be executed by trained specialized electro techn...

Страница 15: ...when the internal temperature reaches 4 C Additionally under no circumstances must the automatic filling valve be left open as there is the danger that if the collector bank has a small leak at some...

Страница 16: ...c building sanitary etc in force y y It is recommended to place a vessel under the hydraulic unit of a capacity suitable to collect the anti freeze liquid that may run from the security valve The pres...

Страница 17: ...stant to high temperatures and suitable for solar installations Insulating material Thread according to DIN 2999 ISO 7 and ISO 228 standards Measurement accuracy 10 from the final value Anti freeze li...

Страница 18: ...pump ca be replaced without having to empty the system using the stop cocks on the suction side Setter Inline PF and the pressure side ball valve 7 8 BALL VALVE FOR THE EASY FILLING AND EMPTYING OF T...

Страница 19: ...the position V 6 Connect the evacuation pipeline of the safety valve to the position VI of the hydraulic unit NOTE The safety valve should have a drain pipe connected to its outlet This pipe should r...

Страница 20: ...is washed at an hour of low sunlight to avoid damages due to expansion contraction due to temperature changes y y If the fittings are worn screws pugs piping etc these should be replaced at the owner...

Страница 21: ...insulated Has the installment on the roof been done according to the local regulations HYDRAULIC CONNECTIONS Are there any leaks in the closed circuit the connections or in the tube heat exchanger Ar...

Страница 22: ...22 NOTES...

Страница 23: ...23 Buffer Water Tanks...

Страница 24: ...uffer Water Tanks 160 1000 lt NOBEL INTERNATIONAL EAD SOLAR WATER HEATING SYSTEMS INDUSTRY 48 Vitosha Blvd Elin Pelin 2100 Sofia Region Bulgaria Tel 359 2 4210232 email info nobel bg www nobel bg Inst...

Отзывы: