Buffer Water Tanks

Piping:

 the routing of the piping and cabling must be agreed upon between the installer and the client, so as to ensure 

the proper installation of the solar system in compliance with local rules concerning water and electrical installations.

Make sure that the tubes connecting the storage tank with the collector and the piping to/from the water heater 

are insulated in such a way that they can withstand temperatures covering the range of: -30°C to 120°C. Anti-UV 

protection must be used for the insulation. 

Antifreeze Liquid:

 The special heat transfer medium used in the closed circuit protects the system from freezing and 

from salt accumulation inside the collector tubes. The thermal fluid must be well mixed with water in a percentage that 

is necessary to protect the system. The responsibility for the appropriate heat transfer medium quantity as well as for 

the use of other liquid than the one accompanying the solar water heater lies on the installer and in no case on the 

company. The use of water or inappropriate liquid may annul the warranty validity. 

After the installation is completed, the area where the work was executed should be clean & tidy. The warranty 

should be filled in and the customer should sign it and immediately mail it to the company. The customer should fill 

in the check list provided by the company. The company does not hold any responsibility that may be the result of an 

inappropriate installation or incorrect use of components used for the solar water heater installation.

INSTALLATION POSITION

The installation is only allowed on roofs and flat surfaces of adequate bearing capacity. Before you proceed with the 

installation, make sure that the roof and/or the construction is of adequate bearing capacity in terms of statics, always 

according to the expected maximum loads at the installation point. If the installation is in a place with an extremely 

big wind and snow load, the system as a whole should be statically checked by a skilled person, e.g a specialized 

engineer. In special cases, strengthening or more solid constructions may be required.

Space requirements for installation on the roof (TILED ROOF)

For the installation on the roof the following points must be taken care of:

• 

The minimum distances from the ends of the roof should be:

 -

 From the sides: distance equal to the width of two tiles

 -

 From the top of the roof: distance equal to three rows of tiles

• 

The minimum distance limit of 0.8 m should necessarily be respected, in order for the collectors and the mounting 

accessories not to be exposed to winds the power of which increases on the perimetrical edges of the roof.

Space requirements for free standing installation (FLAT ROOF) 

The system should be installed at least 1.5 m away from the edges of the roof so as for:

 

y

The systems to be accessible for maintenance reasons.

 

y

The systems and the fixing system not to be exposed to strong winds which are developed at the ends and 

edges of the roof.

 

y

The snow to be removed.

Содержание 1000lt

Страница 1: ...Installation maintenance use instructions Buffer Water Tanks 160 1000 lt Technical Manual...

Страница 2: ......

Страница 3: ...ger BF2 11 GENERAL INSTALLATION RULES 12 INSTALLATION POSITION 13 GENERAL PREVENTION MEASURES 14 INSTRUCTIONS FOR THE INTERCONNECTION OF COLLECTORS IN SOLAR FIELDS 15 RECOMMENDATIONS ON HEAT TRANSFER...

Страница 4: ...imum use of hot water should be made during daytime so that the system can continuously produce hot water during the daylight hours maintaining thus its maximum efficiency SOLAR WATER HEATING The coll...

Страница 5: ...rbon dioxide emissions are reduced Central solar systems are made of excellent materials according to international specifications and have all the certificates and tests that attest their quality The...

Страница 6: ...e following table PACKAGING 1 Buffer 2 Collector s 3 Support base fittings Accessories 4 Hydraulic Unit 5 Palette 1 2 2 3 4 5 FITTINGS ACCESSORIES FITTING ACCESSORIES FOR COLLECTORS KIT FOR FC BUFFER...

Страница 7: ...are important for the future identification of the product When applied Capacity xxx lt Weight xxx kg Max working pressure xxx bar Max working temperature xxx C Lower heat exchanger surface S1 xxx m2...

Страница 8: ...onal internal coil type heavy duty steel type Tubo integrated in the upper part of the buffer tank for the connection of the secondary heating source y y Thermal insulation which minimises heat losses...

Страница 9: ...243 243 239 239 331 331 Sensor Level P2 mm 424 489 666 628 712 678 797 Sensor Level P3 mm 605 735 1088 1018 1184 1025 1262 Sensor Level P4 mm 786 981 1511 1407 1656 1372 1727 Thermometer L mm 786 981...

Страница 10: ...ernal Diameter D ext mm 600 600 600 700 700 990 990 Internal Diameter D int mm 500 500 500 600 600 850 850 Height HT mm 1035 1230 1760 1655 1900 1770 2100 Lower HE Outlet C mm 242 242 242 238 238 331...

Страница 11: ...990 External Diameter D ext mm 700 700 990 990 Internal Diameter D int mm 600 600 850 850 Height HT mm 1655 1900 1770 2100 Lower HE Outlet C mm 238 238 331 331 Lower HE Inlet D mm 778 913 878 1046 Up...

Страница 12: ...ION RULES ATTENTION Installation must be in compliance with local national rules concerning water and electrical installations plumbing electricity hygiene urban and others The solar system s packagin...

Страница 13: ...t may be the result of an inappropriate installation or incorrect use of components used for the solar water heater installation INSTALLATION POSITION The installation is only allowed on roofs and fla...

Страница 14: ...al systems can only be undertaken by authorized specialized companies and trained personnel y y Works in electrical installations or conductors have to be executed by trained specialized electro techn...

Страница 15: ...when the internal temperature reaches 4 C Additionally under no circumstances must the automatic filling valve be left open as there is the danger that if the collector bank has a small leak at some...

Страница 16: ...c building sanitary etc in force y y It is recommended to place a vessel under the hydraulic unit of a capacity suitable to collect the anti freeze liquid that may run from the security valve The pres...

Страница 17: ...stant to high temperatures and suitable for solar installations Insulating material Thread according to DIN 2999 ISO 7 and ISO 228 standards Measurement accuracy 10 from the final value Anti freeze li...

Страница 18: ...pump ca be replaced without having to empty the system using the stop cocks on the suction side Setter Inline PF and the pressure side ball valve 7 8 BALL VALVE FOR THE EASY FILLING AND EMPTYING OF T...

Страница 19: ...the position V 6 Connect the evacuation pipeline of the safety valve to the position VI of the hydraulic unit NOTE The safety valve should have a drain pipe connected to its outlet This pipe should r...

Страница 20: ...is washed at an hour of low sunlight to avoid damages due to expansion contraction due to temperature changes y y If the fittings are worn screws pugs piping etc these should be replaced at the owner...

Страница 21: ...insulated Has the installment on the roof been done according to the local regulations HYDRAULIC CONNECTIONS Are there any leaks in the closed circuit the connections or in the tube heat exchanger Ar...

Страница 22: ...22 NOTES...

Страница 23: ...23 Buffer Water Tanks...

Страница 24: ...uffer Water Tanks 160 1000 lt NOBEL INTERNATIONAL EAD SOLAR WATER HEATING SYSTEMS INDUSTRY 48 Vitosha Blvd Elin Pelin 2100 Sofia Region Bulgaria Tel 359 2 4210232 email info nobel bg www nobel bg Inst...

Отзывы: