background image

3

 

Instructions before use 

3-1

 

Confirmation  of  all  components  for  shipping  damage  or  oil  leakage.  If  any  shipping 
damage  is  found,  notify  carrier  at  once.  Shipping  damage  is  not  covered  by  warranty. 
The carrier is responsible for all repair or replacement costs resulting from damage in 
shipment. 

 
3-2

 

Oil feeding plug                    CAUTION 
Use it after 2

3 turns loosens a plug. 

 
 

 
3-3    Confirmation of your power supply                  WARNING 

Power supply is 220V 50/60Hz single phase. Make sure that a grounded outlet or a plug 
adapter with a grounding attachment must be used. 
 

3-4    Confirmation of hydraulic oil                    WARNING 

Always  check  oil  level  before  operation,  with  the  connected  cylinders  fully  retracted 
(extended if pull cylinders). In case oil is added with cylinders fully extended and then 
cylinders  are  retracted,  the  returned  oil  will  overflow  in  the  reservoirs,  causing 
generation of high pressure in the reservoirs, confirm required oil volume in a reservoir 
as follows; 

 

Retract the connected cylinder fully. 

 

Check the oil gauge and confirm if oil is feeded up to half of the gauge. If oil is short, 
not  reaching  the  half  of  the  level  gauge,  replenish  oil.  (See  5-1  kind  of  hydraulic 
working oil). 

 
 

4

 

Operation 

 

UP-45SVG-0

 with P.T. manifold, but without any operation valve. 

 

1

 

Plug in the pump. 

2

 

The P.T. manifold has a delivery port and return port. Depress “ON” operation switch to 
run  the  motor  pump  to  deliver  oil.  A  remote  mounted  type  operation  valve  is  usually 
installed between the pump and cylinder in such an application as where the pump is 
far away form an operation position. 

 
 
 
 

UP-45SVG-1

 with MVS-3 2-way manual valve. 

 
1

 

Plug in the pump. 

2

 

Close release valve lever by turning clockwise (stop at 45

°

)and depress “ON” switch 

to advance the cylinder. 

3

 

To retract the cylinder, return the lever to the original (front) position. 

 
 
 

Содержание UP-45SV Series

Страница 1: ...ELECTRIC HYDRAULIC PUMPS UP 45SV G 0 1 7 Series Operation and maintenance manual NITTOH ZOHKI CO LTD 102 4 10 2 Chome Kamezawa Sumida ku Tokyo 130 Japan Telephone 03 3625 6551 Facsimile 03 3625 6553...

Страница 2: ...fety information 2 page 2 Description of components 4 3 Instructions before use 5 4 Operation 5 5 Maintenance 6 6 Circuits 10 7 Construction drawings 11 8 Parts lists 13 9 Trouble shooting guide 15 10...

Страница 3: ...al damage only will happen Cautions when installed WARNING Install a pump unit for better balance Since the reservoirs of totally emclosed rubber structure are used in this series pumps the pumps can...

Страница 4: ...ngle phase Make sure your line voltage must be the same as the voltage your pump is wired for Wrong voltage connection or voltage drop of your line shall cause burning or heating Be careful about volt...

Страница 5: ...5m UP 45SVG 1 Erectric motor Metal plug socket Power supply plug HP relief valve Oil feeding plug Reservoir Oil gauge Delivery port block Pressure gauge Pendant switch 2 5m Power cable 2 5m Manual op...

Страница 6: ...ned oil will overflow in the reservoirs causing generation of high pressure in the reservoirs confirm required oil volume in a reservoir as follows Retract the connected cylinder fully Check the oil g...

Страница 7: ...oil temperature or take such a measure as installation of an oil cooler Oil exchange CAUTION The frequency of oil change will depend upon general working conditions severity of use and overall cleanli...

Страница 8: ...d into hydraulic system causing damage Trim loose ends 5 3 High pressure hoses Hose installation WARNING Install hoses leaving something in reserve because high pressure hoses expand and contract more...

Страница 9: ...upward b Remove any load from the cylinder s and cycle the hydraulic system through several cycles fully extend and retract the cylinders or intermittently 2 to 3 minutes 5 6 Carbon brushes Cautions w...

Страница 10: ...ing is needed to adjust and set at lower pressure than the standard Contact NITTOH authorized distributor Loosen lock screw on the relief valve and turn the adjusting screw a few turns counter clockwi...

Страница 11: ...10 6 Circuits UP 45SVG 0 Hydraulic Circuit Electric Circuit UP 45SVG 1 Hydraulic Circuit Electric Circuit UP 45SVG 7 Hydraulic Circuit Electric Circuit...

Страница 12: ...11 7 Construction drawings The pump part is an attached sheet Drawing attachment The valve part mentions it according to a model as follows UP 45SVG 0 UP 45SVG 1...

Страница 13: ...12 UP 45SVG 7...

Страница 14: ...d plug 1 33 P 8 O ring 1 34 4P53053 Return pipe 1 35 UHP 16 Hole plug 1 36 4P53055 Guide plate 1 37 M5 10 Fitting bolt 1 38 M5 Spring washer HL valve portion 2 1 5 Steel ball 2 2 WY5 10 Spring 2 3 4P5...

Страница 15: ...P54057 Push screw 7 11 2 5 13 8 Needle roller 7 12 P 11 O ring 7 13 MS4 10 Positioning pin 7 14 WH5 10 Spring 7 15 5 Steel ball 7 16 4P52065 Handle 7 17 M6 15 Set screw 7 18 PT3 8 Delivery nipple 7 19...

Страница 16: ...dy 6 Damage or out of adjustment of relief valve 1 Repair or replace it 2 Fill reservoir to 1 2 of level gauge with all cylinders retracted 3 Bleed the system 4 Pump filter should be cleaned and if ne...

Страница 17: ...ranty claim will be accepted for damage or breakdown arising for any of the following reasons Abuse or improper use fair wear and tear faulty or negligent operation improper storage chemical electrica...

Отзывы: