
11
Original Instructions
SH SOLAR G, GH, GW
3.13 Connection of funnel
Standards and requirements
to funnel installations may vary
from country to country. Before
installing the funnel, you should
contact the local authorities.
The following funnel connec-
tions are not legal in all coun-
tries and are therefore only
intended as a guide. However,
all installations must comply
with the following requirement:
Max. length: 1.5 m
Fixed funnel
Natural draught
Cowl with draught
3.14 Drain, G models
Your machine features a drain.
The drain runs through a water
cup placed underneath the
electric box of the machine.
Therefore the water cup must
be
fi
lled with distilled water be-
fore the machine is started.
Filling:
Dismount the cabinet
and remove the cover of the
water cup. Then
fi
ll with distilled
water until the water runs
through the drain hose and out
of the water cup.
The drain hose must be guided
to a sewer system. In case
of local requirements to the
disposal of drain water, contact
the local authorities.
NOTE:
In order that the drain
will work properly it is impor-
tant that the machine is level
and that the drain hose is not
placed above the level of the
boiler bottom.