BRUSHING SYSTEM
SERVICE MANUAL
ENGLISH
SC350
9098840000
15
BRUSH DECK DISASSEMBLY/ASSEMBLY
Disassembly
Place the machine on a hoisting system (if available), then lift it. Otherwise, drive the machine on a level floor.
1.
Make sure that the battery connector is disconnected.
2.
Disconnect the vacuum hose from the squeegee.
3.
Disassemble the end-of-stroke cable fastener.
4.
Lift the machine and remove the brush.
5.
Remove the screw and the hub assembly (see the previous paragraph).
6.
Remove the 4 screws (A), the flange (B) and disassemble the brush deck (C).
7.
Check the rubber pads (D) for integrity; if necessary replace them by removing the 3 nuts (E).
8.
NOTE
The rubber pads (D) allow the deck mechanical rotation by creating friction on the rotating brush.
Check the rubber joint (F) for integrity; if necessary remove the 13 screws (G), recover the nuts, flanges (H) and (I), and
9.
replace it.
NOTE
The rubber joint (F) absorbs blows and vibrations between the deck and the machine.
Assembly
Assemble the components in the reverse order of disassembly and note the following:
10.
When the rubber joint (F) is fastened to the deck, install the flanges (I) by placing their tooth (J) as shown in the figure.
•
NOTE
For further information on deck components see the Spare Parts List.
A
D
G
B
E
A
H
C
I
F
J
P100424