14
- FORM NO. 56043025 / BA 700, 800, 1000 / 28LX, 32LX, 38LX / 280HD, 320HD, 380HD
SOLUTION SYSTEM
______________________________________________________________________________________________
SOLUTION CABLE REPLACEMENT - BA 800, 1000 / 32, 38LX / 320, 380HD
1
Drain the solution tank at a designated “DISPOSAL SITE”.
2
Remove the left splash guard.
3
See Figure 5. Disconnect Ball Joint
(L)
from the valve arm. Be careful not to lose the bushings.
4
Remove the cable from the chassis cable mount (note the cable position in the mount), then remove Ball Joint
(L)
from the cable.
5
See Figure 4. Remove Panel
(J)
.
6
Disconnect Ball Joint
(K)
from the lever, and then remove the balljoint from the cable.
7
Remove the cable from the control handle cable mount, (note the cable position in the mount).
8
Before removing the cable, take note of the cable routing. Pull the cable down and out through the bottom of the
control handle, and then pull it out through the rear of the chassis.
9
Follow steps 1-8 in reverse order to reassemble. Test the new cable for proper operation before reinstalling the handle
panel and splash guard.
FIGURE 5