7.
OPERATION
Document
ID:
73
‐
H006.
Copyright
©
Nilar
AB.
All
rights
reserved.
31
(34)
7.
Operation
This
chapter
gives
information
on
what
to
check
prior
to
operation.
For
all
other
operation
related
information,
we
kindly
refer
to
the
documentation
from
Ferroamp.
7.1
Checklist
for
operation
Before
the
Nilar
Home
Box
can
be
operated,
please
check
that:
All
the
previously
stated
safety
precautions
have
been
followed!
The
power
connection
to
the
Ferroamp
EnergyHub
is
made
correctly!
o
Section
6.7
The
battery
packs
are
installed
correctly!
o
Section
6.11
The
fuses
are
inserted
and
activated.
o
Section
6.11.13
The
cabinet
is
assembled
with
all
its
covers!
o
Section
6.12
Once
the
above
is
checked
and
ensured,
the
Nilar
Home
Box
can
be
started
up
according
to
the
instructions
from
Ferroamp
(please
contact
Ferroamp).
During
the
start
‐
up
procedure
and
when
in
operation,
please
check
that:
The
operation
LED’s
on
the
battery
packs
are
signaling
the
expected
status!
o
Section
4.7.1
Содержание Ferroamp Home Box
Страница 1: ...21 0001 21 0002...