Total Station NPL-322 Instruction Manual
99
Menu Key
5
Creating a new job
1.
Press the
Creat
softkey in the job list.
2.
Enter a job name of up to eight characters. Press
[ENT]
.
3.
Do one of the following:
–
To check the job settings, press the
Sett
softkey.
–
To create a new job using the current job
settings, press
[ENT]
or the
OK
softkey.
Job settings
The following settings are set when a job is created, and cannot be changed. This
ensures that the data in a job is correctly stored in the database, and that all necessary
corrections are applied when you store each record..
Scale Factor
0.999600 to 1.000400
T-P correction
ON/OFF
Sea Level
ON/OFF
C&R correction
OFF/0.132/0.200
Angle unit
DEG/GON/MIL
Distance unit
Metre/US-Ft/I-Ft
Temp unit
°C/°F
Press unit
hPa/mmHg/inHg
If you select US-Ft or I-Ft, an additional settings screen appears. Use this
screen to specify whether to display values in Decimal-Ft or Ft-Inch.
VA zero
Zenith/Horizon/Compass
AZ zero
North/South
Order
NEZ/ENZ
HA
Azimuth/0 to BS
Содержание NPL-322
Страница 14: ...Contents xiv Total Station NPL 322 Instruction Manual ...
Страница 38: ...2 Preparation 24 Total Station NPL 322 Instruction Manual ...
Страница 68: ...3 Getting Started 54 Total Station NPL 322 Instruction Manual ...
Страница 110: ...4 Applications 96 Total Station NPL 322 Instruction Manual ...
Страница 154: ...5 Menu Key 140 Total Station NPL 322 Instruction Manual ...
Страница 161: ...Total Station NPL 322 Instruction Manual 147 Checking and Adjustment 6 ...
Страница 162: ...6 Checking and Adjustment 148 Total Station NPL 322 Instruction Manual ...
Страница 169: ...C H A P T E R 8 Total Station NPL 322 Instruction Manual 155 System Diagrams 8 In this chapter System Components ...
Страница 172: ...8 System Diagrams 158 Total Station NPL 322 Instruction Manual ...
Страница 188: ...9 Communications 174 Total Station NPL 322 Instruction Manual ...