SD Series
Operating & Safety Instructions
English/USA 09/03
36
4.7.4
SETTING TO WORK
Before use each day and at the beginning of each shift the machine shall be given a visual and
functional test including, but not limited to, the following
1)
Check all lubrication points for adequate application of grease, oil etc.
2)
Inspect all threads for ease or operation - especially descent valves, brake release valve etc.
3)
Check level and quantity of oil. Remove any contaminants - water, etc.
4)
Check batteries for electrolyte and state of charge.
5)
Check electrics for damage and insulation.
6) Using base controls, cycle machine over complete envelope in accordance with the
Operating Instructions. Cure any defects.
7)
Ensure that all safety devices and controls operate in accordance with the instructions.
8)
If necessary, perform a load test to establish the machine stability before putting the machine
to work.
Содержание 170SD series
Страница 2: ......