background image

SD Series 

 

 Operating & Safety Instructions

 

 

English/USA   09/03

 

18 

 

 

 

 

 

ITEM 

DESCRIPTION 

NUMBER 

QTY 

26 No 

Step 

(Small) 

P14785 

27 Drive/Steer 

P12850 

28 Ground 

Controls 

P11577 

29 

Daily Safety Check List 

P14908 

30 Setting 

Up 

P14888 

31 Platform 

Controls 

P11581 

32 Charger 

Supply 

P14904 

33 Ground 

Levers 

P14928 

34 Platform 

Levers 

P14927 

35 Pushbuttons 

P11828 

36 Platform 

Capacity 

P14781 

37 

Base Key Switch 

P15221 

38 Diesel 

Fuel 

Only 

P14414 

39 Identity 

Plate 

P15383 

40 'Niftylift' 

Logo 

P14597 

41 Model 

Number 

P14600 

42 'British 

Made' 

P10780 

 

 

 

 

 

 

 

 

 

 

Содержание 170SD series

Страница 1: ...Drive Stonebridge Milton Keynes MK13 0ER England www niftylift com e mail info niftylift com Tel 44 0 1908 223456 Fax 44 0 1908 312733 NATIONAL ACCREDITATION OF CERTIFICATION BODIES REGISTERED COMPAN...

Страница 2: ......

Страница 3: ...erational Safety Check Schedules 12 13 3 4 Placard Decals and Installation 14 19 3 5 Torque Requirements 20 4 OPERATION 4 1 Control Circuit Components 21 23 4 2 Setting up Procedures 24 4 3 Ground Con...

Страница 4: ...y forbidden One of the most important facts to remember is that any equipment is only as safe as those who operate it DANGER WARNING CAUTION IMPORTANT INSTRUCTIONS AND NOTICE Any place these topics ma...

Страница 5: ...e Niftylift SD Self Drive is a range of extremely versatile articulating boom mounted via a 360 powered swing mechanism Driven from the platform the Niftylift 170SD SD50 Self Drive accommodates up to...

Страница 6: ...E LENGTH x WIDTH 0 65m x 1 1m 25in x 44in CONTROLS Full proportional hydraulic HYDRAULIC PRESSURE 200bar GRADEABILITY 25 TRAVEL SPEEDS Fast 3mph 4 83kph Slow 1 2mph 1 93kph GROUND CLEARANCE 100mm 4in...

Страница 7: ...TION UK PLATE 0 1 2 3 4533 3 3 63 45 1 33 45 333 1 333 78 1 0 333 5 2 0 33 9 3 333 3 333 0 00 3 2 00 33 This manufacturer s plate is attached to Boom 1 on each machine at the time of manufacture on ev...

Страница 8: ...A PLATE 0 1 2 3 2 1 0 4 3 4 3 2 3 5 55 2 0 0 555 1 0 555 4 0 4 3 2 4 55 2 4 5 555 5 2 555 3 33 5 4 0 33 55 4 2 This manufacturer s plate is attached to Boom 1 on each machine at the time of manufactur...

Страница 9: ...ys operate the Niftylift in full accordance with the manufacturers Operating Safety Instructions for that model 2 1 3 Before use each day and at the beginning of each shift the Niftylift shall be give...

Страница 10: ...rtificially increase the outreach of the platform Never use boards or ladders in the platform to achieve the same result 2 1 15 Do not use the platform to lift overhanging or bulky items which may exc...

Страница 11: ...rt to his superior any problems or malfunctions of the Niftylift which becomes evident during operation Any problems or malfunctions that affect the safety of operation shall be repaired prior to cont...

Страница 12: ...l temperature not to exceed 23 to 93 Celsius Extended operation in dusty environments is not recommended frequent cleaning will be necessary All dust dirt salt encrustation excess oil or grease should...

Страница 13: ...cise operating instructions Carry out the Inspection service pre hire check list see pages 38 39 before placing machine in service 3 2 PREPARATION FOR USE Whilst every effort has been made at the Nift...

Страница 14: ...erate freely 8 Check that operating buttons and emergency stop buttons function properly 9 Check the operation of the emergency hand pump 10 Visually inspect all hydraulic hoses and fittings for damag...

Страница 15: ...le and centre post 7 Inspect the engine fuel tank for damage or leaks 8 Check telescopic boom wear pads and nylon studs if applicable 9 Lightly oil the jack pad ball joints and outrigger housings 10 C...

Страница 16: ...Battery Acid P14872 2 7 Danger HR and Trailers P15227 2 8 9 Emergency H pump P14807 1 10 Trip Reset P10875 3 11 Outriggers P14855 5 12 Basket Levelling P10853 1 13 Isolator On Off P12230 1 14 Wheel Re...

Страница 17: ...e Steer P12850 1 28 29 30 31 32 33 Ground Levers P14926 1 34 Platform Levers P14927 1 35 Pushbuttons P11828 1 36 Platform Capacity P14801 1 37 Base Key Switch P15221 1 38 Diesel Fuel Only P14414 1 39...

Страница 18: ...ONTROLS GROUND CONTROLS PLATFORM CONTROLS PLATFORM CONTROLS 16 16 14 14 33 33 27 27 4 4 7 7 41 41 9 9 26 26 40 40 29 29 30 30 OPTIONS OPTIONS 4 POSNS 4 POSNS 6 6 28 28 6 6 28 28 12 12 31 31 32 32 22 2...

Страница 19: ...Rotating Machinery P15010 2 8 Operating Instructions P14892 1 9 Emergency H pump P14807 1 10 Trip Reset P10875 3 11 Outriggers P14836 4 12 Boom Clamp P14841 2 13 Isolator On Off P14021 1 14 Wheel Rele...

Страница 20: ...Safety Check List P14908 2 30 Setting Up P14888 1 31 Platform Controls P11581 1 32 Charger Supply P14904 1 33 Ground Levers P14928 1 34 Platform Levers P14927 1 35 Pushbuttons P11828 1 36 Platform Cap...

Страница 21: ...6 6 13 13 12 12 30 30 28 28 29 29 4 4 24 24 35 35 STOP STOP HORN HORN BATT BATT OFF OFF ENG ENG POWER POWER CONTROL CONTROL 4 4 4 4 25 25 18 18 11 11 4 1 2 34 34 22 22 17 17 8 43 43 17 17 GROUND CONTR...

Страница 22: ...CREW QUALITY SIZE Tightening torque in ft lbs Nm Grade 8 8 10 9 M 6 7 4 10 10 14 M 8 18 5 25 26 35 M 10 36 49 51 69 M 12 65 86 89 120 M 14 100 135 140 190 M 16 155 210 218 295 M 18 215 290 300 405 WHE...

Страница 23: ...irstly it can be used as a manual alert by pushing the Horn button at the Platform Control Station Secondly it is the device which sounds continuously if the tilt alarm sensor detects excessive inclin...

Страница 24: ...damage can occur in a relatively short time 4 1 9 BATTERY ISOLATOR A battery disconnect switch is located beneath the centre bonnet section which allows the machine control and power circuits to be i...

Страница 25: ...ulics to be directed to either the outrigger drive circuit downwards or the boom operation upwards The outrigger drive circuit requires the booms to be lowered in order to operate The boom circuit nee...

Страница 26: ...machine grasp and hold duty selector Power will be available automatically 9 From the cage control station depress and hold the green power button or footswitch to give hydraulic power to the outrigg...

Страница 27: ...e 170SD will automatically default to the primary power source usually battery PETROL GASOLINE ENGINE OR PETROL GASOLINE ELECTRIC MODELS 8 For a cold engine start go to step 9 or for a warm engine go...

Страница 28: ...the jacks Failure to follow this procedure could result in serious injury or risk of death 4 3 2 BOOM FUNCTIONS A Push and hold green power button 1 2 3 B Select lever 1 2 or 3 for desired boom funct...

Страница 29: ...turn the switch to the Start position fully clockwise and the engine will fire 7 WARM ENGINE turn the main engine ignition switch on the platform control box to the Start position clockwise and the en...

Страница 30: ...erstructure is the 5 lever drive outrigger hand valve These control the following functions Left hand lever Two axis joystick for drive Up for Forward Down for reverse Steer Left for Left Right for Ri...

Страница 31: ...EL DRIVE JACK CONTROL Situated adjacent to the single drive steer joystick is the box comprising of the toggle switches controlling each stabiliser leg These operate individually to either lower or ra...

Страница 32: ...Select lever 1 2 3 4 5 or 6 for desired boom function 1 Operates Cage Swivel optional UP for right DOWN for left 2 Operates Cage Levelling FORWARD for forward BACK for back 3 Operates Telescope UP for...

Страница 33: ...trol position A Up for FORWARD B Down for REVERSE C Left for STEER LEFT D Right for STEER RIGHT 5 All control levers give a fully proportional response therefore the more the lever is moved away from...

Страница 34: ...Green light and pulsing Red light the batteries are fully charged UNDER NO CIRCUMSTANCES SHOULD BATTERIES BE LEFT ON CHARGE FOR PERIODS IN EXCESS OF 24 HOURS 4 DISCONNECT FROM POWER SUPPLY ONCE BATTER...

Страница 35: ...n lead to a reduction in the chargers efficiency Both of these can result in over heating of the cable with the attendant risk of fire short circuits or damage to the components themselves The charger...

Страница 36: ...ne by its booms Always secure chains or straps to the chassis 4 7 2 TOWING Hydraulic Drive motors and spring applied Brakes Towing the Niftylift in case of an emergency 1 If parked on a slope securely...

Страница 37: ...h into the block 6 In order to drive the machine once more the brake release valve will need to be closed by turning clockwise The wheel motors are now re connected to the hydraulic circuit 7 If the b...

Страница 38: ...operation especially descent valves brake release valve etc 3 Check level and quantity of oil Remove any contaminants water etc 4 Check batteries for electrolyte and state of charge 5 Check electrics...

Страница 39: ...d lever controls in platform or at ground control station FOLLOWING AN EMERGENCY DESCENT RECOVERY OF THE PLATFORM FULLY EXTEND AND RETRACT ALL CYLINDERS FROM GROUND CONTROL STATION BEFORE USING THE MA...

Страница 40: ...ttons Operation of all booms over full range Wheel bearings OK Cylinders are silent Cage is level over full range Booms levelling rods not damaged or distorted Booms levelling rods cylinders not fouli...

Страница 41: ...connections secure Hoses not kinked or fouled Charger control box secure Batteries secure Electrolyte level and specific gravity Charger operation Hydraulic oil level Engine Gear box oil FINISH Pivot...

Отзывы: