Summary
Preface
P. 6
Chapter 2
P. 17
Technical data
Chapter 5
P. 76
Reception, storage
and installation
Chapter 4
P. 54
General information
Chapter 3
P. 47
Application notes
Chapter 6
P. 115
Options
Chapter 7
P. 129
Preventive maintenance
Chapter 1
P. 15
Overview
and installation diagram
Answer Drives 1000
132
7
7.3 AD1000 - PM003 DRIVE
The tool required for this operation is a digital multimeter set to “diodes test”
Check the diodes and the IGBTs after disconnecting the power supply
cables to prevent false readings due to external components.
The first operation is a visual check, then follow this sequence:
SUBGROUP
OPERATION
SPECIAL TOOLS, INSTRUMENTS PRESCRIPTIONS
TIME INTERVALS
PRECEDENCE
AND
MATERIALS
Jumper Check
Digital multimeter
Carry out the safety
6 months
operation
specified
in
chapter
4
7.3 AD1000 - PM003 DRIVE
Содержание AD1A008FBBNH
Страница 138: ......