Operating Manual “FAN Commander 200” ECE 03-0200-5E-MG
Seite 17 von 24
5.2 Commissioning
5.2.1 Quick Commissioning – fan driven by speed setting
required: Connection Power supply (24V) / Bus (NetA/NetB)
Mainmenu
Sublevel 1
Sublevel 2
Sublevel 3
1. „
Login
“ as Administrator
default password „0000“
2. „
Database
“
used Bus Line (1/2) „
Config Line
“
choose relevant Bustyp
„
Install Fan
“
„
Scan Line
“
Found devices will be installed automatically –
correct fan addressing required!
3. „
Configuration
“
choose – Single / Line / Group / All
max. speed checked or set correctly
4. „
Control
“
choose – Single / Line / Group / All
„
Speed Day
“
set day speed in %
„
Start Fan
“
Start Control
5.2.2 Quick Commissioning – fan driven by closed loop control
required: Connection Power supply (24V) / Bus (NetA/NetB) / Sensor AI (0…10V)
1. „
Login
“ as Administrator
default password „0000“
2. „
Database
“
used Bus line (1/2) „
Config Line
“
choose relevant Bustyp
„
Install Fan
“
„
Scan Line
“
Found devices will be installed automatically –
correct fan addressing required!
„
Assign group
“
assign (fan) group ( 1 …10) for closed loop control
0 = none group
3. „
Configuration
“
choose – Single / Line / Group / All
max. speed checked or set correctly
4. „
Controller
“
„
Config Controller
“
choose Controller 1 or Controller 2 (acc. connection
of sensor to AI1 or AI2)
„
Group
“
assign under #2 defined fan group to Controller
if needed adapt further controller settings
„
Control Controller
“
choose Controller 1 or Controller 2
„
Set Day
“
Set Control value in %
„
Start Controller
“
Start Controller with “Day-setting”
Содержание FAN Commander 200
Страница 21: ...Operating Manual FAN Commander 200 ECE 03 0200 5E MG Seite 21 von 24 8 Notes...
Страница 22: ...Operating Manual FAN Commander 200 ECE 03 0200 5E MG Seite 22 von 24...
Страница 23: ...Operating Manual FAN Commander 200 ECE 03 0200 5E MG Seite 23 von 24...
Страница 24: ...Operating Manual FAN Commander 200 ECE 03 0200 5E MG Seite 24 von 24...