NICOR, Inc. 2200 Midtown Place NE, Albuquerque, NM 87107 P: 800.821.6283 F: 800.892.8393 www.nicorlighting.com
April 12, 2018 11:25AM VT2-20 rev 1.1
Page 1 of 4
VT2 LED VAPORTITE
INSTALLATION INSTRUCTIONS
The installation must only be performed by a licensed electrician.
To prevent death, injury or damage to property, this product must be installed in accordance to National Electrical Code (NFPA70) in the
US or Canadian Electrical Code (CSA 22.1) in Canada.
Disconnect power before installing the product or servicing it.
Wait until fixture has cooled down before installing or servicing the fixture.
MIN. 90°C SUPPLY CONDUCTORS
Suitable for operation in ambient not exceeding 40°C
For Surface Mount: Identify mounting location
and mounting bracket spacing. Use 1/4 in max size
drill bit to drill two mounting holes per bracket in
the surface and attach brackets to ceiling
(Screws and anchors included).
For Cable Mount (sold separately): Identify
mounting location and cable spacing. Use 1/4 in
max size drill bit to drill two mounting holes per
mount. Fasten cable mount to surface and attach
other end to mounting brackets. Adjust cable
height as desired. (Screws and anchors included).
Carefully unpack fixture from packaging and
inspect for any damage caused in shipping.
Turn off power to
appropriate circuit
at the breaker panel.
3a
3b
1
2
What’s In The Box
GENERAL INSTALLATION INSTRUCTION
For all mounting methods.
One (1) VT2
Mounting Clips
(2ft = 2, 4ft = 3)
Hardware Pack
(2 Cord Grips, Mounting
Hardware)
x2
Tools Needed
A screwdriver, drill, a pair of wire cutters/strippers, and
an M3 allen wrench will be needed to install the VT2.