3.4 - Barrier lift fixture
3.4.1 - If the support surface already exists
01.
Open the cabinet of the barrier (
fig. 13
);
02.
Place the barrier on the fixing surface and trace the points where the slots
are to be fixed (
fig. 14
);
03.
Move the barrier and drill the traced surface points; then insert 4 expansion
bolts, not supplied (
fig. 15
);
04.
Position the barrier correctly and secure by means of the relative nuts and
washers not supplied (
fig. 16
).
3.4.2 - If the support surface does not exist
01.
Dig the foundation pit (
*
) to house the foundation plate;
02.
Prepare ducting for connection cables (
fig. 17
);
03.
On the foundation plate, fix the 4 bolts, placing a nut on the upper side of
each and one on the lower side of the plate (
fig. 17
).
Caution
– The lower
nut must be tightened down to the threaded section;
04.
Now cast the concrete, and before it sets, embed the foundation plate,
which must be positioned flush with the surface, parallel to the pole and
perfectly level (
fig. 17
). Wait for the concrete to set completely; in general,
at least 2 weeks;
05.
Remove the 4 upper nuts of the bolts;
06.
Open the cabinet of the barrier (
fig. 18
);
07.
Position the barrier correctly and secure it by means of the relative nuts
and washers supplied with the foundation plate and removed in point 04
(
fig. 19
).
(
*
) Note - The fixing surface must be perfectly smooth and flat. If the surface is
in concrete, it must be at least 0.15 m thick, and must be adequately reinforced
with steel cages. The concrete volume must be greater than 0.2 m
3
(a thick-
ness of 0.25 m corresponds to 0.8 m
2
; in other words equal to a square base
of approx. 0.9 m per side). Anchoring to the concrete can be by means of 4
expansion bolts, fitted with 12 MA screws, which resist to a traction load of at
least 400 Kg. If the fixing surface is in another material, the consistency must be
checked and ensure that the 4 anchoring points can resist a load of at least
1000 Kg. For fixture, use 12 MA screws.
3.5 - Pole installation
3.5.1 - Pole support assembly
01.
Insert the two plugs in the relative seats on the output motor shaft (
fig. 20
);
02.
Position the support on the output motor shaft, placing it in the “vertical
pole” position and tighten the relative screws and washers fully down to
secure (
fig. 21
);
03.
Position the pole cover and partially secure by means of the 6 screws sup-
plied (
fig. 22
).
3.5.2 - Pole assembly (3 metres / 5 metres)
01.
Assemble the two pole insertions (
fig. 23
);
02.
Insert, from the same end of the pole, the insertions just assembled. Use a
rubber mallet (
fig. 24
);
03.
Lightly grease the aluminium guide on both sides (
fig. 25
);
08.
Perform this operation on both ends of the pole: insert the first part of impact
protection rubber in the slot, through to the end of the pole; then insert the
joint for the impact protection rubber (
fig. 26
) and repeat with all parts;
09.
The impact protection rubber may protrude by about 1 cm from the end of
the profile (
fig. 27
):
A)
position the pole plug and lock it with the two screws (
fig. 28
);
B)
position and block the two rubber cover plugs (
fig. 28
);
10.
Insert the pole assembly in the pole support shell, pushing it up to the end
and then tighten the 6 previously inserted support screws fully down (
fig. 29
).
TABLE 4
LENGTH OF THE POLE
M3BAR
M5BAR
M7BAR
LBAR
2,65 m
3,15 m
3,5 m
4,15 m
5,15 m
5,15 m
5 m,
6,33 m
7,33 m
7,33 m
8,33 m
9,33 m
entire
entire
with joint
ACCESSORIES
XBA13 - Rubber
A1
A3
0
0
C2
0
0
0
B2
0
0
B1
XBA4/XBA6/XBA18 - Lights
A1
A3
1
1
C2
1
1
1
B2
1
1
B1
WA13 - Rack
-
-
1
1
-
2
1
1
-
2
2
-
WA12 - Mobile support
-
-
5
4
-
4
3
3
-
3
3
-
XBA11 - Pivot Pole
B3
B3
C1
C3
-
-
-
-
-
-
-
-
POSITION OF THE SPRING ANCHORING HOLE
0÷1 = B2 0÷1 = B3
0÷2 = A2 0÷2 = B1
0÷2 = A1 0÷2 = A3
2÷7 = B3 2÷4 = C1
3÷5 = A2 3÷5 = B2
3÷4 = A2 3÷6 = B1
5÷6 = C2
6÷7 = A3
5÷6 = A3
Example:
M5BAR with 4m pole + Rack
(1piece) (value:1) + Pole lights
(value:1) =
Sum of values: 2
Risult
= POSITION
C1
A
M3BAR / M5BAR
M7BAR / LBAR
1
2
3
B
C
1
2
3
A
B
Содержание M3BAR
Страница 2: ......
Страница 26: ......
Страница 30: ...II 4 3 b a c d g h f e c a b...
Страница 31: ...III 5 6 MBAR a c d b...
Страница 32: ...IV 90 8 9 MBAR a b c a b 7 a b...
Страница 33: ...V 180 10 11 LBAR c a a b...
Страница 34: ...VI 13 14 12 LBAR c a b...
Страница 35: ...VII 15 16 18 17...
Страница 36: ...VIII 19 20 21 23 22...
Страница 37: ...IX 24 26 25 28 1 cm 27 29...
Страница 38: ...X 33 34 30 31 32 c a b c a b...
Страница 39: ...XI 35 36 37 45 38 a b a b c...
Страница 41: ...XIII 42 43 44 STOP 45 46 LIGHT 47...
Страница 42: ...XIV 48 49 50 a b c...
Страница 43: ...XV 51 52 a b...
Страница 44: ...XVI 53 a b c d e f g...
Страница 46: ...XVIII F1 F1 F2 F2 55...
Страница 47: ......
Страница 48: ...ISTML BARR01 4865_07 10 2011 www niceforyou com Nice SpA Oderzo TV Italia info niceforyou com...