4
– English
3
INSTALLATION
Important! Before installing the product, refer to chapters 2 and 10.
Before performing installation, check the integrity of the product components, the adequacy of the model chosen and the suitability of the envi
-
ronment destined for installation.
IMPORTANT
– The gear motor cannot automate a manual gate that does not have an efficient and safe mechanical structure.
Moreover, it cannot solve defects caused by incorrect installation or bad maintenance of the gate itself.
Fig. 1
shows an example of automated plant realised with Nice com-
ponents. These components are positioned according to the typical
and usual layout.
With reference to
fig. 1
, establish the approximate position where
each component envisioned in the plant will be installed and the most
appropriate connection layout.
A
- Photocell post
B
- Pair of opening stops
C
- Control panel (electrical panel)
D
- Flashing light
E
- Photocell
F
- foundation case with actuator LFAB / XLFAB(...)
G
- Vertical electric lock
H
- Key-operated selector switch or digital keypad
G
A
A
F
F
D
B
B
C
E
E
H
1
WARNINGS
• Incorrect installation may cause serious physical injury to those working on or using the system.
01.
Dig a generously sized foundation pit to house the foundation box
Prepare a drain pipeline for draining off water and avoid the build-
up of water
Содержание LFAB4000
Страница 2: ...2 English ...