8
1 - T5ETL-1K AND T7ETL-1K OPERATOR INSTALLATION (Continued)
1.2 - Placing and attaching the pivot bracket and the gate attachment bracket:
Refer to Figure 1 LOCATING POSITION FOR PIVOT BRACKET for placing the pivot
bracket for the T5 and T7 swing gate operators. The dimensions shown in Figure 1
(dim. A and dim. B.) should be adjusted as necessary depending upon the post size
or hinge location. Cut the pivot bracket and weld the pivot bracket to the base as
shown in Figure 4 PIVOT BRACKET ADJUST AND WELD, being careful to check
that the bracket is level.
Attach the gate attachment bracket to the gate based on the position and dimension shown in Figure
5 ATTACHMENT BRACKET LOCATION. The T5/T7 gate operator must be fastened to the gate in a
completely level position. Ensure that the gate attachment bracket is located at a “hard point” on the
gate suitable for opening or closing the gate.
Figure 5 - ATTACHMENT BRACKET LOCATION
Figure 4 - PIVOT BRACKET ADJUST AND WELD