Wood firing

Lighting instructions

It is important that initial firing is carried out carefully in a 
new boiler so that any remaining crystallisation water in 
the ceramics is condensed slowly to prevent cracking.

Add approximately 4 kg of finely chopped kindling 

 

wood and then tightly screwed up newspapers on top. 
Light the newspaper and leave the filler door ajar.
Wait until the wood has caught fire properly (flue gas 

 

temperature approximately 130 – 150°C) and the 
green light comes on.
Close the door and let the fire burn to a bed of em-

 

bers, approximately 30 – 45 minutes depending on the 
amount of wood.
Once a bed of embers has been created, more wood 

 

can be added.
Check that the flue gas temperature rises, this is a sign 

 

that combustion has started.

The boiler is now in normal operating mode.

Add more wood when a bed of embers remains at the 

 

bottom of the hearth.

Adding wood

Add wood via the filler door. When this door is opened, a 
microswitch is affected, which, in, turn increases the speed 
of the fan. 
It is important that the amount of fuel is adjusted accord-
ing to the temperature levels in the accumulator system so 
that it does not become overcharged.
Even out the embers before adding more wood. Then 
close the filler door. The speed of the fan is now slowed 
and normal operation resumed.
VEDEX 3300 is designed for 0.5 
m long pieces of wood. Stack 
the wood well when adding. 
Start by laying three logs as 
marked in the image. Position 
the logs so that they do not ob-
struct the grate hole. If shorter 
pieces of wood are used, stack 
these over the grate hole to-
wards the rear wall.

When the wood in the boiler has been burned and the 

 

flue gas temperature drops to 80 – 85 °C, and a mini-
mal bed of embers remains, the green light should go 
out, if not, readjust the flue gas thermo-
stat. 
It is now set and should not need further 
adjustment. At the next firing procedure, 
the green light automatically comes on 
when the flue gas temperature has reached approxi-
mately 80 – 85°C.

Readjustment

The flame can be checked through the sight glass af-
ter about 30 minutes operation. The colour of the flame 
should then be yellow with a light blue tint.
The following points should be observed for VEDEX 3300 
to perform optimally:

Follow the lighting procedure by checking the flue gas 

 

temperature.
The fan should never stop during the firing cycle.

 

 When the accumulator is fully charged, there should 

 

no longer be any wood in the wood magazine.
Never open the combustion chamber door during op-

 

eration.
 The combustion of wood can vary depending on its 

 

moisture content and type as well as on the position of 
the primary air damper.

 

 If the wood is not fed downwards and the flue gas 
temperature is low, this may be due to an insufficient 
amount of air being drawn in through the primary air 
ducts. Adjust the damper to the left.

 
 
 

 If the wood burns as in 
case (A), the air supply is 
too great from the top and 
too low from the middle.

 

 If the wood burns as in 
case (A), the air supply is 
too great from the middle 
and too low from the top.

 

 The correct air flow as per 
case (C) gives the most ef-
ficient combustion.

 

 It is not necessary to adjust the primary air damper if 
any of cases fallen (A) and (B) occur on the odd occa-
sion.

A

B

C

20

100

40

80

60

0

120

2

1

bar

3

0

4

1

2

3

Wood firing

Содержание VEDEX 3300

Страница 1: ...MOS GB 0733 1 VEDEX 3300 M10528 INSTALLATION AND MAINTENANCE INSTRUCTIONS VEDEX 3300 LEK...

Страница 2: ......

Страница 3: ...__________________________ 9 Pipe installation Connection_ ______________________________________ 10 Flue gas thermometer______________________________ 10 Filling_ ____________________________________...

Страница 4: ...bers in brackets refer to the section Component locations The boiler is designed for houses with water borne heating and is environmentally approved for accumulator tank firing This appliance is not i...

Страница 5: ...of wa ter heater size or the length of coil Abbreviations HW Hot water CW Cold water S V Safety valve AV Shut off valve WH Water heater EX Expansion vessel SV1 Shunt valve SV2 Mixer valve CP1 Charge p...

Страница 6: ...stops the fan when the boiler temperature exceeds the set value Charge thermostat Thisthermostat starts and stops the charge pump at the set value 20 100 40 80 60 0 120 2 1 bar 3 0 4 Indicator lamp f...

Страница 7: ...door 66 pulling up the turbulator and brushing clean This should be done a few times between chimney sweep visits For optimum combustion and efficiency the boiler s sec ondary combustion chamber shou...

Страница 8: ...fter the supply of secondary air Primary air control The control damper on the front of the boiler is used to distribute the air supply to the hearth In the left position the air supply is from the to...

Страница 9: ...of wood are used stack these over the grate hole to wards the rear wall When the wood in the boiler has been burned and the flue gas temperature drops to 80 85 C and a mini mal bed of embers remains...

Страница 10: ...take must be as large as the smoke pipe duct Chimney VEDEX 3300 has a vertical flue pipe connection with an external diameter of 133 mm Angled flue pipe supplied as standard Different chimney heights...

Страница 11: ...amic grate Place the ceramic inserts in through the filler door First position the front stone B Then position the rear stones C and D followed by stones E and F Flame trough Open the combustion chamb...

Страница 12: ...e component parts Note Flue gas thermometer VEDEX 3300 is supplied with an enclosed flue gas ther mometer which must be installed in the flue gas door outlet Filling Fill the boiler with water using a...

Страница 13: ...the electrical panel for this type of docking See Electrical installation Reconnection When the boiler s temperature and flue gas temperature exceeds the set temperature on the relevant thermostat th...

Страница 14: ...nnection also the charge pump Electrical circuit diagram Electrical installation Laddpump Max thermostat 3 only controls the boiler s fan and charge thermostat 19 only controls the external charge pum...

Страница 15: ...070 590 85 20 40 1115 1150 170 R32 inv 125 159 inv R25 inv R32 inv 15 utv R25 inv 15 utv 370 450 R25 inv min 250 515 180 125 1275 Minsta avst nd till v gg 250 mm 125 70 1320 Technical specifications T...

Страница 16: ...specifications 45 42 40 3 36 19 2 Component location boiler section Component location front panel 133 utv R25 inv 15 utv R25 inv 125 45 19 3 42 40 2 36 83 22 22 66 96 83 66 96 33 81 82 33 81 82 100...

Страница 17: ...3 Front panel 36 Indicator lamp operation 40 Thermometer 42 Manometer 45 Control switch 64 Sight glass 65 Filler door 66 Soot door for convection part 68 Combustion door 81 Flow line R32 int 82 Expans...

Страница 18: ...cessories LEK LEK LEK Charger pack 1 Part no 089 872 Contents 1 x non return valve connection 25 1 x charge pump 6 mvp with shutoff valves 1 x shunt valve for heating system connection 25 1 x circulat...

Страница 19: ...ler water volume 65 litres Voltage 230 V Average output during wood firing 33 kW Wood magazine volume 95 litres Wood magazine width 300 mm Wood magazine depth 550 mm Filler door width 300 mm Filler do...

Страница 20: ...wice a year for optimum function and a long serv ice life Check that the boiler is off and that no embers are in the combustion chamber Disconnect the fan from the electrical socket on the boiler Remo...

Страница 21: ...into the flue gas fan when sweeping use the supplied cover plate as follows Remove the soot door Insert the cover plate over the hole as illustrated Reinstall the soot door to prevent soot exiting wh...

Страница 22: ...20 VEDEX 3300...

Страница 23: ......

Страница 24: ...STAD NB Tel 0168 477722 Fax 0168 476998 E mail info nibenl nl www nibenl nl V lund Varmeteknik Filial af NIBE AB Brog rdsvej 7 6920 Videb k Tel 97 17 20 33 Fax 97 17 29 33 E mail info volundvt dk www...

Отзывы: