Nibe NV 10 Скачать руководство пользователя страница 7

Design

In the event of a leak in the brine circuit, the level mon-
itor float interrupts the heat pump operation and an
alarm, “brine level sensor has tripped”, is signalled on
the heat pump display. Operation of the brine pump and
compressor is blocked until the alarm has been reset.

LEK

Level monitor NV 10

Electrical connection

NOTE

All electrical connections must be carried out
by an authorised electrician.

Electrical installation and wiring must be carried
out in accordance with the stipulations in force.

The main product must be disconnected from
the power supply when installing NV 10.

CONNECTING COMMUNICATION

Route the cable from the level monitor through the cable
grommet (UB3) to the PCB (AA2).

Caution

A description of how to remove panels and
covers, as well as where (UB3) is placed, can
be found in the Installer Manual for the compat-
ible heat pump.

Strip the insulation from the contacts and connect to
the PCB (AA2).

Select one of the inputs AUX 1-9 on terminal block AA2-
X28:3-11.

Connect earth to one of the inputs on the earth terminal
block AA2-X29:1-12.

1

2

3

3

4

5

AA2-X28

AA2-X29

External

NV 10

Compatible

main product

Program settings

MENU 7.4 - SELECTABLE IN/OUTPUTS

Here, you state where the external switch function has
been connected, either to one of the AUX inputs on
terminal block X28 or to the AUX output on terminal
block X27.

Select "brine monitor".

7

NV 10 | GB

Содержание NV 10

Страница 1: ...Installat rshandbok Niv vakt SE Installer manual Level monitor GB Installateurhandbuch Niveauw chter DE IHB 1940 6 611812 NV 10 L E K S1155 S1255 F1126 F1226 F1145 F1155 F1245 F1255 F1345 F1355...

Страница 2: ......

Страница 3: ...minst llningar English 6 Important information 6 General 7 Design 7 Electrical connection 7 Program settings Deutsch 8 Wichtige Informationen 8 Allgemeines 9 Aufbau 9 Elektrischer Anschluss 9 Programm...

Страница 4: ...ndboken Allm nt Niv vakten NV 10 anv nds n r de lokala f ruts ttningar na eller best mmelserna kr ver en ut kad kontroll av k ldb rararkretsen MONTERING Montering sker enligt f ljande Skruva fast niv...

Страница 5: ...ANSLUTNING AV KOMMUNIKATION Dra kabeln fr n niv vakten genom kabelgenomf ringen UB3 till grundkortet AA2 T NK P Beskrivning av demontering av pl tar och lock samt var UB3 r placerad hittar du i insta...

Страница 6: ...ler Manual General The level monitor NV 10 is used when the local condi tions or regulations require an extended check of the brine circuit MOUNTING Install as follows Screw the level monitor into the...

Страница 7: ...10 CONNECTING COMMUNICATION Route the cable from the level monitor through the cable grommet UB3 to the PCB AA2 Caution A description of how to remove panels and covers as well as where UB3 is placed...

Страница 8: ...10 wird verwendet wenn die lokalen Gegebenheiten oder Bestimmungen eine erwei terte Kontrolle des W rmequellenkreises erfordern MONTAGE F hren Sie die Montage wie folgt durch Verschrauben Sie den Niv...

Страница 9: ...sorgt werden ANSCHLUSS DER KOMMUNIKATIONSLEITUNG Verlegen Sie das Kabel vom Niveauw chter durch die Kabeldurchf hrung UB3 zur Basisplatine AA2 ACHTUNG Eine Beschreibung zur Demontage von Platten und A...

Страница 10: ...ling English 15 Important information 15 General 16 Design 16 Electrical connection Deutsch 19 Wichtige Informationen 19 Allgemeines 20 Aufbau 20 Elektrischer Anschluss 23 Kontaktinformation NV 10 DE...

Страница 11: ...10 anv nds n r de lokala f ruts ttningar na eller best mmelserna kr ver en ut kad kontroll av k ldb rararkretsen MONTERING Montering sker enligt f ljande Skruva fast niv vakten i niv k rlets ppning I...

Страница 12: ...ng ska utf ras enligt g llande best mmelser Huvudprodukten ska vara sp nningsl s vid in stallation av NV 10 F1345 har olika elinkopplingar beroende p n r v rme pumpen tillverkades F r att se vilken el...

Страница 13: ...str mst llare SF1 i l ge 2 Demontera frontluckan 3 Demontera plastlocket till ell dan 4 Dra kabeln fr n niv vakten genom kabelgenomf ringen UB3 ner till ing ngskortet AA3 Kabelgenomf ring F1145 F1155...

Страница 14: ...kabelgenomf ringen UB3 fram till framkant av elkopplingen LEK LEK UB3 4 Skala bort kontakter och montera p kopplingsplint X6 V lj n gon av ing ngarna AUX 1 3 p plint AA3 X6 9 14 eller AUX 4 5 p plint...

Страница 15: ...itor NV 10 is used when the local condi tions or regulations require an extended check of the brine circuit MOUNTING Install as follows Screw the level monitor into the opening in the level vessel In...

Страница 16: ...ith the stipulations in force The main product must be disconnected from the power supply when installing NV 10 F1345 has different electrical connection versions de pending on when the heat pump was...

Страница 17: ...move the front hatch 3 Remove the plastic cover for the electrical distribu tion box 4 Route the cable from the level monitor through the cable grommet UB3 down to the input board AA3 Cable gland F114...

Страница 18: ...cable grommet UB3 to the front edge of the elec trical connection LEK LEK UB3 4 Strip the insulation from the contacts and install on the terminal block X6 Select one of the inputs AUX 1 3 on terminal...

Страница 19: ...kalen Gegebenheiten oder Bestimmungen eine erwei terte Kontrolle des W rmequellenkreises erfordern MONTAGE F hren Sie die Montage wie folgt durch Verschrauben Sie den Niveauw chter in der ffnung des N...

Страница 20: ...eltenden Vor schriften zu ber cksichtigen Das Hauptprodukt darf bei der Installation von NV 10 nicht mit Spannung versorgt werden F1345 verf gt je nach Herstellungsort der W rmepumpe ber verschiedene...

Страница 21: ...2 Nehmen Sie die Frontabdeckung ab 3 Entfernen Sie die Kunststoffabdeckung vom Schaltschrank 4 Verlegen Sie das Kabel vom Niveauw chter durch die Kabeldurchf hrung UB3 hinab zur Eingangspla tine AA3...

Страница 22: ...n Sie das Kabel vom Niveauw chter durch die Kabeldurchf hrung UB3 zur Vorderkante des elektrischen Anschlusses LEK LEK UB3 4 Isolieren Sie die Kontakte ab und verbinden Sie sie mit der Anschlussklemme...

Страница 23: ...3 01510 Vantaa Tel 358 0 9 274 6970 info nibe fi nibe fi NORWAY NETHERLANDS GREAT BRITAIN ABK AS Brobekkveien 80 0582 Oslo Tel 47 23 17 05 20 post abkklima no nibe no NIBE Energietechniek B V Energie...

Страница 24: ...Energy Systems All product illustrations facts and specifications are based on current information at the time of the publication s approval NIBE Energy Systems makes reservations for any factual or...

Отзывы: