5.
Strip the insulation from the contacts and install on
the terminal block (X1). Select one of the inputs
X1:3-6.
Connection F1126
5
6
7
8
4
2
3
1
B
A
5
6
7
8
4
2
3
1
9
10
AUX1
X1
X1
External
F1126
Connection F1226
5
6
7
8
4
2
3
1
B
A
5
6
4
2
3
1
AUX1
External
F1226
X1
X1
6.
Reinstall the front cover.
7.
The heat pump starts again when the switch (SF1)
is set to “ ” position.
8.
Enter menu 5.4. Activate the AUX input you have
chosen to connect NV 10 to by selecting “brine
monitor”.
F1145/1155/1245/1255
Connection occurs as follows:
1.
Set the heat pump's switch (SF1) to " ".
2.
Remove the front hatch.
3.
Remove the plastic cover for the electrical distribu-
tion box.
4.
Route the cable from the level monitor through the
cable grommet (UB3) down to the input board (AA3).
Cable gland
F1145/F1155
F1245/F1255
SF1
5.
Strip the insulation from the contacts and install on
the input board (AA3). Select one of the inputs AUX
1-5 on terminal block AA3-X6:9-18.
Connection F1145/F1155
F1245
Externt
9 10 11 12 13 14 15 16
B
A
AA3-X6
Heat
pump
External
AA3-X6
AUX1
Connection F1245/F1255
9
10
11
12
13
14
15
16
B
A
Heat
pump
External
AUX1
AA3-X6
AA3-X6
6.
Reinstall the front cover.
7.
The heat pump starts again when the switch (SF1)
is set to “ ” position.
8.
Enter menu 5.4. Activate the AUX input you have
chosen to connect NV 10 to by selecting “brine
monitor”.
17
NV 10 | GB