
Cable routing
The following image shows recommended cable routing
from the distribution box to the condensation water
trough on the inside of F2120. The transition between
the electrical cable and the heating cable must occur
after the lead-in to the condensation water trough. The
distance between the distribution box and the lead-in
to the condensation water trough is approx. 1,600 mm.
1. Remove the top and side panels.
L
EK
2. Thread hose clamp on.
3. Route the heating cable through the condensation
water pipe.
4. Route the heating cable through the drain pipe on
the reverse of KVR 10. Press the insulation down
slightly.
5. Connect the hose to the drain pipe and tighten the
hose clamps. Pull the insulation towards the panel.
6. Secure the insulation with a cable tie.
7. Stretch the heating cable and ensure that the
marking on the heating cable is as close to the drain
pipe as possible.
8. Route the heating cable to the electrical connection.
9. Use cable ties and strap anchors to secure the heat-
ing cable, see images.
LEK
L
E
K
Data
Serie.nr
.
Art.nr
. 7114
53
OUT
IN
EB14
Condensation water pipe KVR 10
Chapter 3 |
Electrical connection
20
Содержание KVR 10
Страница 1: ...Installer manual LEK Condensation water pipe KVR 10 Accessories IHB GB 1646 3 331785...
Страница 2: ......
Страница 27: ......