
Cable routing
The following image shows recommended cable routing
from distribution box to condensation water pipe. Route
the heating cable (EB14) through the grommet under-
neath and secure with two cable ties at the electrical
connection. Transfer between electrical cable and heat-
ing cable must occur after the lead-in to the condensa-
tion water pipe.
1. Remove the front and side panels.
2. Remove the rear cover plate from the stand.
L
E
K
L
E
K
DATA
DATA
3. Pull off the protective paper and secure the gasket
to the condensation water connection, see image.
4. Thread hose clamp on.
5. Route the heating cable through the condensation
water pipe.
6. Route the heating cable through the drain pipe on
the connection plate, see image.
LE
K
1.
2.
3.
7. Pull the insulation down slightly, connect the hose
to the drain pipe and tighten the hose clamp, as il-
lustrated.
LE
K
1.
2.
3.
8. Push the insulation up towards the trough and se-
cure it using cable ties, see image.
LE
K
1.
2.
3.
9. Loosen the nut and remove the washer that holds
the heat pump module to the stand. Fit the holder
to the module's foot and reinstall the washer and
nut. Now clamp the gasket between the adapter
and the bottom of the module. When the drain holes
have been adjusted over each other, tighten the nut.
10. Stretch the heating cable and ensure that the
marking on the heating cable is as close to the drain
pipe as possible.
11. Route the heating cable to the electrical connection.
17
Chapter 3 |
Electrical connection
Condensation water pipe KVR 10
Содержание KVR 10
Страница 1: ...Installer manual LEK Condensation water pipe KVR 10 Accessories IHB GB 1646 3 331785...
Страница 2: ......
Страница 27: ......