
Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be
carried out by a suitably
d person.
Date
Signature
Notes
Description
Hot water (page 14)
Shut
valves
Expansion vessel
T&P valve
Tundish
Cold water (page 13 and 14)
Shut
valves
Non-return valve
Mixing valve
Safety valve
Tundish
Electricity (page 16)
Hot water sensor
Temperature limiter
Miscellaneous
Benchmark checklist
5
Chapter 1 |
Important information
Содержание HA-WH5 F
Страница 2: ...HA WH 5016 F HA WH 5020 F HA WH 5030 F HA WH 5020 FS HA WH 5030 FS...
Страница 23: ......