
Docking
9
For the Installer
FIGHTER 2010
Several FIGHTER 2010s together with
SMO 10 and water heater (floating condensing)
HR
HR
HR
VP2
VP1
SV1
FG1
RG1
SMO 10
CP1
PG
UG
LP2
LP1
VVG
VVC
VXV1
P
SÄV
SÄV
SÄV
AV
AV
BV
BV
RG
TV
RG
TV
BV
SF
SF
SMO 10 controls up to nine FIGHTER 2010s (of which
max one for hot water), electric element, circulation
pump, shunt, etc. FIGHTER 2010 works with floating
condensing against the heating system and prioritizes
hot water charging via the reversing valve VXV1.
FIGHTER 2010 works in stage 1 or stage 2 depending
on the outdoor air temperature and the heating
requirement.
FIGHTER 2010 HP1 heats the hot water. If FIGHTER
2010 cannot meet the heating requirement, additional
heating is shunted in from the oil-fired boiler. When
additional heat is engaged, hot water is heated using
the immersion heater in the hot water heater.
FIGHTER 2010 HP1 is connected in at position (44a)
using the enclosed modular cable (15m) from SMO
10. HP2 is connected in to HP1 using the shielded
3-core cable on the screw terminal (44b).
The above diagram is equipped with accessories.
HP 2
HP 1
Содержание FIGHTER 2010 Series
Страница 1: ...R INSTALLATION AND MAINTENANCE INSTRUCTIONS FIGHTER 2010 MOS GB 0609 5 611864 FIGHTER 2010 LEK...
Страница 2: ......
Страница 34: ...FIGHTER 2010 Miscellaneous 32...
Страница 35: ......