Pipe connections
General
■
Pipe installation must be carried out in accordance
with current norms and directives.
■
We recommend three ways of leading off condensa-
tion water; to an indoor drain (subject to local rules
and regulations), stone caisson, gutter drainage or
other frost free collection point.
■
When casting the base, the holes for AG-CH10 must
have an internal diameter of 110 mm.
■
Route the pipe downward from the air/water heat
pump.
■
The insulation of AG-CH10 must seal against the bot-
tom of the condensation water trough.
■
The drain from AG-CH10 must be positioned at frost
free depth or indoors (subject to local rules and regu-
lations).
■
The drain from AG-CH10 must be able to receive up
to 100litres of condensation per day.
■
The installation must be equipped with a water seal
where air circulation can occur in the condensation
water pipe.
Drain indoors
Water seal
Joint
The condensation water is lead to an indoor drain (sub-
ject to local rules and regulations).
Route the pipe downward from the air/water heat pump.
The condensation water pipe must have a water seal to
prevent air circulation in the pipe.
AG-CH10 spliced as illustrated. Pipe routing inside house
not included.
Stone caisson
LEK
Frostfritt djup
Frost proof
depth
If the house has a cellar the stone caisson must be posi-
tioned so that condensation water does not affect the
house. Otherwise the stone caisson can be positioned
directly under the heat pump.
The outlet of the condensation water pipe must be at
frost free depth.
11
AG-CH10 | GB