background image

A H E A D   O F   T H E   F L O W

®

www.nibco.com

NIBCO INC. WORLD HEADQUARTERS • 1516 MIDDLEBURY ST. • ELKHART, IN 46516-4740 • USA • PH: 1.800.234.0227  

TECH SERVICES PH: 1.888.446.4226 • FAX: 1.888.234.0557 • INTERNATIONAL OFFICE PH: +1.574.295.3327 • FAX: +1.574.295.3455

www.nibco.com

3

®

3. Installation of Wall Mount Style Indicator Post

3.1  Fully OPEN the gate valve to which the Indicator Post is being attached.

3.2  Remove 1” square Operating Rod (26) with attached Coupling (25) from Indicator Post by sliding it out from bottom, See Fig. 2.

3.3  Insert Operating Rod (26) thru exterior wall and fully engage Coupling onto Operating Nut of Valve as shown in Fig. 3.  Mark 

the Operating Rod (26) at a distance of 12¼” from exterior face of wall.  Remove Operating Rod (26) from wall and cut-off 

the top section of the 1” square Rod at location you just marked.  Remove any sharp edges from the Rod with a file.

3.4  Reinstall the shortened Operating Rod (26) into the Wall Indicator Post by sliding it into the 1” square pocket in bottom side, 

See Fig. 2.    

3.5  Lift Wall Indicator Post assembly and insert Operating Rod (26) thru exterior wall and fully engage Coupling (25) onto Operating 

Nut of valve as shown in Fig. 4.  Rotate and Orient Wall Post assembly until desired location of View Windows is obtained.  

Align and level Operating Rod with valve Operating Nut then mark position of 4 wall mounting holes thru Flange (27).

3.6  Remove Wall Indicator Post assembly from the wall.  Drill exterior wall as marked for appropriate size (customer supplied) 

mounting bolts.

3.7  Reinstall Wall Indicator Post assembly onto wall making sure the Coupling (25) is fully engaged on Operating Nut of valve.  

Secure Post assembly to wall with 4 bolts. 

Table 2

WALL MOUNT STYLE INDICATOR POST PARTS LIST

NO.

DESCRIPTION

MATERIAL

SPECIFICATION

QTY.

1

UPPER BODY

DUCTILE IRON

ASTM A536 Gr. 65-45-12

1

2

CAP

DUCTILE IRON

ASTM A536 Gr. 65-45-12

1

3

T-HEAD BOLT, CAP

STEEL, ZINC PLATED

ASTM A105

2

4

NUT, CAP

STEEL, ZINC PLATED

ASTM A105

2

5

OPERATING STEM

BRONZE

ASTM B584 C84400 / B62 C83600

1

6

RETAING RING, STEM

STAINLESS STEEL

ASTM A276 S30400

1

7

LEADING BOGIE

BRONZE

ASTM B584 C84400 / B62 C83600

1

8

TARGET PLATE, OPEN

ALUMINUM

ASTM B26

2

9

TARGET PLATE, SHUT

ALUMINUM

ASTM B26

2

10

EXTENSION PLATE

STEEL, PAINTED BLACK

ASTM A1008

2

11

TARGET ROD

BRASS

ASTM B16 C36000

2

12

VIEW WINDOW

POLYCARBONATE

COMMERCIAL

2

13

GASKET, WINDOW

RUBBER

ASTM D2000 EPDM

2

14

GUARD, WINDOW

CAST IRON

ASTM B124 Gr. B

2

15

HANDWHEEL

DUCTILE IRON

ASTM A536 Gr. 65-45-12

1

16

EYEBOLT, HANDWHEEL

FORGED STEEL, ZINC PL. ASTM A105

1

17

WASHER, H.W. RETAINER

STEEL, ZINC PLATED

COMMERCIAL

1

19

SCREW, HEX HEAD CAP

STAINLESS STEEL

S30400

4

20

WASHER

STAINLESS STEEL

S30400

4

21

SCREW, SLOTTED FLAT HD.

STAINLESS STEEL

S30400

4

22

PLUG, 1/2" PIPE

STEEL, ZINC PLATED

COMMERCIAL

1

23

U-BOLT

FORGED STEEL

ASTM A105

1

24

COTTER PIN

STAINLESS STEEL

S30400

1

25

COUPLING, OPERATING ROD

DUCTILE IRON

ASTM A536 Gr. 65-45-12

1

26

OPERATING ROD

STEEL

ASTM A105

1

27

FLANGE, THREADED

DUCTILE IRON

ASTM A536 Gr. 65-45-12

1

37

SCREW, SOCKET HD. SET

STAINLESS STEEL

S30400

6

Fig. 2

Содержание NIP-2AW series

Страница 1: ...peration Failure to follow these instructions may result in reduced product performance and may cause loss of manufacturer s warranty 1 Application 1 1 NIBCO Indicator Posts are primarily used with multi turn non rising stem NRS post indicator valves PIV controlling water supplies to sprinkler deluge water spray foam and standpipe systems used in fire protection service 1 2 NIBCO Indicator Posts a...

Страница 2: ...cator Valve PIV that operates from 10 to 50 turns and a maximum operating torque of 900 ft lbs DIMENSIONAL DATA FOR NIBCO RWGV AND IBBM GATE VALVES VALVE SIZE NIBCO RESILIENT WEDGE GATE VALVES RWGV NIBCO IRON BODY BRONZE MOUNTED GATE VALVES IBBM TURNS TO OPEN A B 1 2 PIPE OD TURNS TO OPEN A B 1 2 PIPE OD INCH MM INCH MM INCH MM INCH MM INCH MM INCH MM 4 13 13 46 342 10 12 257 2 40 61 9 14 13 359 1...

Страница 3: ... wall Drill exterior wall as marked for appropriate size customer supplied mounting bolts 3 7 Reinstall Wall Indicator Post assembly onto wall making sure the Coupling 25 is fully engaged on Operating Nut of valve Secure Post assembly to wall with 4 bolts Table 2 WALL MOUNT STYLE INDICATOR POST PARTS LIST NO DESCRIPTION MATERIAL SPECIFICATION QTY 1 UPPER BODY DUCTILE IRON ASTM A536 Gr 65 45 12 1 2...

Страница 4: ...BCO INC WORLD HEADQUARTERS 1516 MIDDLEBURY ST ELKHART IN 46516 4740 USA PH 1 800 234 0227 TECH SERVICES PH 1 888 446 4226 FAX 1 888 234 0557 INTERNATIONAL OFFICE PH 1 574 295 3327 FAX 1 574 295 3455 www nibco com 4 Fig 3 Fig 4 INSTALLATION LAYOUT ...

Страница 5: ... 4 3 Grasp Cap 2 and remove from Indicator Post by lifting upward until Target assembly is clear 4 4 Target Plates 8 9 must be positioned with the OPEN Plate 8 above the SHUT Plate 9 for left hand counter clockwise opening valves See Fig 5 TARGET ASSEMBLY PARTS LIST NO DESCRIPTION MATERIAL SPECIFICATION QTY 7 LEADING BOGIE BRONZE ASTM B584 C84400 B62 C83600 1 8 TARGET PLATE OPEN ALUMINUM ASTM B26 ...

Страница 6: ...both SHUT Target Plates 9 at dimension X from OPEN Target Plates 8 See Fig 6 4 9 Secure both SHUT Target Plates 9 by tightening Screws 37a with an Allen wrench NUMBER OF TURNS TO OPEN VALVE DISTANCE BETWEEN TARGETS X INCH MM 10 0 000 0 0 11 0 050 1 3 12 0 150 3 8 13 0 250 6 4 14 0 350 8 9 15 0 450 11 4 16 0 550 14 0 17 0 650 16 5 18 0 750 19 1 19 0 850 21 6 20 0 950 24 1 21 1 050 26 7 22 1 150 29 ...

Страница 7: ... Fig 7 6 Positioning of Targets in View Window 6 1 Rotate Square Operating Stem 5 positioning the center of the OPEN Target Plate 8 until it is located 6 from the inside lip of Cap 2 See Fig 7 6 2 Verify that the valve is in full OPEN position 6 3 Reinstall the Cap 2 Target assembly into the Upper Body 1 making sure both alignment ears on bronze Leading Boogie 7 straddle the guides cast on the ins...

Страница 8: ...allation the PIV should be cycled to the full shut position and both view windows should be visually inspected to assure the SHUT target plates are centered The PIV should then be cycled to the full open position and both view windows should be visually inspected to assure the OPEN target plates are centered 7 4 Valve position can be secured by placing a customer supplied chain through U bolt 23 a...

Отзывы: