![NI Climbing Frames The Oaks Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/ni-climbing-frames/the-oaks/the-oaks_instruction-manual_1685734024.webp)
Step 18: Cargo Net Assembly
•
The cargo rope will be secured from the top of the 720mm post that the base is secured to
and the bottom of the 720mm post secured in the last step. Starting by nailing the cargo net
horizontally along the top post and then make marks every 250mm, this will give you the
position as to where you need to nail the rope on each side, pulling the rope tight across the
horizontal each time. Use the u-nails to secure to the posts
•
Using the remainder of the rope, starting from the top, ties knots around each level of rope,
ensuring the rope is continually pulled tight as you go
Содержание The Oaks
Страница 1: ...The Oaks Instruction Manual...
Страница 4: ...10 Steps 1 11 Slide 1 12 Decking screws 150 13 200mm index screws 12...
Страница 5: ...14 120mm screws 6 15 Grab Handles 6 16 Screw covers 6 17 Telescope 1...
Страница 6: ...18 Steering Wheel 1 19 16mm Green Cargo Rope 8m 20 6 x 60 screws 2...
Страница 19: ......
Страница 26: ...Step 21 Removing the H Frame supports Remove the lower H Frame supports that were added during steps 3 and 7...