![NI Climbing Frames The Oaks Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ni-climbing-frames/the-oaks/the-oaks_instruction-manual_1685734020.webp)
Step 14: Railings Assembly
•
Secure a piece of 900mm x 3” x 1.5” to the outside of two upright posts, the 3” x 1.5” should
be level with the 720mm post that the base is secured to.
•
Secure
another 900mm x 3” x 1.5”to the posts, ensure there is 850mm between the timbers
so the 850mm x 6” x 1” boards can be secured to these.
Содержание The Oaks
Страница 1: ...The Oaks Instruction Manual...
Страница 4: ...10 Steps 1 11 Slide 1 12 Decking screws 150 13 200mm index screws 12...
Страница 5: ...14 120mm screws 6 15 Grab Handles 6 16 Screw covers 6 17 Telescope 1...
Страница 6: ...18 Steering Wheel 1 19 16mm Green Cargo Rope 8m 20 6 x 60 screws 2...
Страница 19: ......
Страница 26: ...Step 21 Removing the H Frame supports Remove the lower H Frame supports that were added during steps 3 and 7...