Note: the square holes on the vertical rails are numbered to easily 
identify each mounting location.

8. Run your cables through the hooks to keep them accessible and 
organized.

13

14

15

Equipment installation

The rack is now assembled and ready for equipment installation.

1. Do not install any equipment until you have stabilized the 
structure.

2. Always load the heavier items at the bottom first, followed by the 
lighter equipment at the top of the rack, for safety reasons.

3. On the already installed vertical rails, count up the square holes 
and insert an M8 cage nut in each square hole, with the tabs facing 
inward.

4. Repeat this procedure until all M8 cage nuts are installed in the 
square holes of the front and back rails.

5. Align the equipment or component that will be mounted on the 
square location where the cage nut has been inserted.

6. Proceed to insert the M8 phillips-head screws and plastic flange 
washers from the inside through the vertical mounting rails and into 
the nuts you installed in the previous step.

7. Tighten the screws to secure the equipment to the vertical rails.

M8 cage nuts (20 or 40)

M8 plastic flange washers (20 or 40)

M8x12mm phillips-head

screws (20 or 40)

LIGHT

HEAVY

LAST

FIRST

9

10

Содержание Professional Series

Страница 1: ...ProfessionalSeries 2 post 19 inch open rack Steel frame with square holes 25 45 RACK UNITS NPO 2P25UB NPO 2P45UB ...

Страница 2: ...cks offer a cost eff effective solution for applications requiring increased flexibility accessibility and cable management capabilities Main features 2 post floor standing open frame rack Supports stationary loads of up to 992lb 450kg Ample ventilation and unobstructed airflow keep your equipment at room temperature It provides a convenient solution with easy access to your cabling IT and communi...

Страница 3: ...l washer Combination wrench M8 13mm M10x80mm anchoring bolt Split lock washer anchoring Flat metal washer anchoring M10 nut anchoring M8 cage nut M8 plastic flange washer M8x12mm phillips head screw M4 philllips self tapping screw Cable management hook User manual 16 1 4 4 4 4 40 40 40 14 14 1 16 1 4 4 4 4 20 20 20 8 8 1 16 16 Rack assembly components Rack assembly hardware continued Equipment mou...

Страница 4: ...dual part to ensure proper assembly of the unit M8 combination wrench 13mm 1 Top frame subassembly 1 Align the top bracket with the holes on the left vertical rail and secure it using the M8 bolts and washers Note If necessary lay the subassembly down on a flat surface to attach the top bracket Make sure not to fully tighten the bolts until all fasteners have been installed 2 Repeat the same instr...

Страница 5: ... the rack in the upright position Note at least two people are required for lifting up the structure for safety reasons 2 Align the cable management hooks with the cable management screw holes along the side of the rack in the preset mounting locations while keeping the hook openings pointing sideways Refer to the image below Anchoring of the structure 1 At this point we highly recommend securing ...

Страница 6: ...l rails count up the square holes and insert an M8 cage nut in each square hole with the tabs facing inward 4 Repeat this procedure until all M8 cage nuts are installed in the square holes of the front and back rails 5 Align the equipment or component that will be mounted on the square location where the cage nut has been inserted 6 Proceed to insert the M8 phillips head screws and plastic flange ...

Страница 7: ...Notes Notes 11 12 ...

Страница 8: ......

Отзывы: