4. Assembly procedure (recommended)
Upon opening the box, inspect the contents to ensure that all the items listed above
are included:
• The illustration provides a view of all the rack
components you are about to put together.
• Open the boxes and verify that all parts, hardware
and accessories are included in the package.
• Inspect the rack components and identify each
individual part to ensure proper assembly of the unit.
M8 combination wrench (13mm)
1
Top frame subassembly
1. Align the top bracket with the holes on the left vertical rail and
secure it using the M8 bolts and washers.
Note:
If necessary, lay the subassembly down on a flat surface to attach
the top bracket.
Make sure not to fully-tighten the bolts until all fasteners have been
installed.
2. Repeat the same instruction to complete the right side.
Phase
Required parts
Step
Top support bracket (1)
Vertical rails (2)
M8x16mm hexagonal bolts (8)
M8 metal washers (8)
2
2
4
1
1
1
7
8
6
3
5
6
Содержание Professional Series
Страница 7: ...Notes Notes 11 12 ...
Страница 8: ......