background image

User manual

 

Caution:

 this product is heavy, at least two qualified people should perform the 

assembly procedure. Care must also be taken while moving or positioning the 
equipment. 

Do not exceed the recommended load capacity per shelf, and the maximum weight 
supported by the rack, as specified by the manufacturer's specifications. Failure to 
comply will void the  warranty of this product.

Safety measures must be practiced at all times during the assembly of this product.

Caution:

 use the recommend tools to avoid damaging the parts.

RACK TIPPING HAZARD:

 ensure that the rack is properly anchored to the floor 

before equipment is installed.

Nexxt solutions does not warrant against damage caused by the use of any Nexxt 
Solutions structures for any purposes other than those for which it was designed or
damage caused by unauthorized attachments or modifications, and is not responsible 
for any damages, claims, demands, suits, actions,  or causes of action of whatever kind 
resulting from, arising out of or in any manner relating to any such use, attachments or 
modifications.

1. Introduction

Thank you for purchasing the two-post open rack from Nexxt Solutions. Available with 
25 and 45 rack spaces, these units are constructed of heavy-duty steel, allowing the 
safe integration of networking equipment and additional accessories in environments or 
areas that do not require a lockable rack solution. Designed for easy deployment in 
high-load and high-density infrastructures, this metalwork component is ideal for 
housing diverse IT equipment and other voice/data devices where space is at a 
premium. Easy to install and to assemble, our open racks offer a cost -eff effective 
solution for applications requiring increased flexibility, accessibility, and cable 
management capabilities.

Main features

• 2-post, floor-standing open frame rack
• Supports stationary loads of up to 992lb (450kg)
• Ample ventilation and unobstructed airflow keep your equipment at room temperature
• It provides a convenient solution with easy access to your cabling, IT and 

communications components

• Front and rear equipment installation for larger networking systems
• Numbered square-hole mounting positions for faster attachment of 19-inch 

components

• Powder coat finish prevents damage caused by rust and other external factors

For support and to find out more about our complete line of products and solutions, 
we invite you to visit us at 

nexxtsolutions.com.

 
 

Carefully read and follow the safety 

instructions included in this manual before 

assembling and using the unit. 

FAILURE TD FOLLOW THESE INSTRUCTIONS CAN LEAD TD 

SERIOUS INJURY, DEATH, OR DAMAGE TO YOUR EQUIPMENT.

IMPORTANT SAFETY INFORMATION

2. Preliminary steps

• Prior to installing this product, you must read all instructions thoroughly.
• Keep these instructions handy in an easily accessible location for future reference. .
• A clean, flat, level, protected floor area should be provided for rack assembly to 

prevent damage to parts.

• The installers may need to have the following items and tools available to assemble 

and install the rack. They are not included in the box.

1. Phillips screwdriver 
2. Power drill with the following bits:
    M8 hexagonal-head tip
3. M8 hex to square socket adaptor 
4. Pair of gloves
5. Long nose pliers
6. Cleaning towel
7. 3mx2m mat or padded surface

1

2

3

6

4

5

ELECTRICAL 

SHOCK 

HAZARD.

DANGER

All parts of the unit must be properly grounded to  the frame 
of the rack and connected to the Common Bonding Network 
[CBN) of your facility.

1

2

Содержание Professional Series

Страница 1: ...ProfessionalSeries 2 post 19 inch open rack Steel frame with square holes 25 45 RACK UNITS NPO 2P25UB NPO 2P45UB ...

Страница 2: ...cks offer a cost eff effective solution for applications requiring increased flexibility accessibility and cable management capabilities Main features 2 post floor standing open frame rack Supports stationary loads of up to 992lb 450kg Ample ventilation and unobstructed airflow keep your equipment at room temperature It provides a convenient solution with easy access to your cabling IT and communi...

Страница 3: ...l washer Combination wrench M8 13mm M10x80mm anchoring bolt Split lock washer anchoring Flat metal washer anchoring M10 nut anchoring M8 cage nut M8 plastic flange washer M8x12mm phillips head screw M4 philllips self tapping screw Cable management hook User manual 16 1 4 4 4 4 40 40 40 14 14 1 16 1 4 4 4 4 20 20 20 8 8 1 16 16 Rack assembly components Rack assembly hardware continued Equipment mou...

Страница 4: ...dual part to ensure proper assembly of the unit M8 combination wrench 13mm 1 Top frame subassembly 1 Align the top bracket with the holes on the left vertical rail and secure it using the M8 bolts and washers Note If necessary lay the subassembly down on a flat surface to attach the top bracket Make sure not to fully tighten the bolts until all fasteners have been installed 2 Repeat the same instr...

Страница 5: ... the rack in the upright position Note at least two people are required for lifting up the structure for safety reasons 2 Align the cable management hooks with the cable management screw holes along the side of the rack in the preset mounting locations while keeping the hook openings pointing sideways Refer to the image below Anchoring of the structure 1 At this point we highly recommend securing ...

Страница 6: ...l rails count up the square holes and insert an M8 cage nut in each square hole with the tabs facing inward 4 Repeat this procedure until all M8 cage nuts are installed in the square holes of the front and back rails 5 Align the equipment or component that will be mounted on the square location where the cage nut has been inserted 6 Proceed to insert the M8 phillips head screws and plastic flange ...

Страница 7: ...Notes Notes 11 12 ...

Страница 8: ......

Отзывы: