Installa
ti
on instruc
ti
ons for the IMM'Ax automa
ti
c immersed safety cover - 28/36
28
7. Accessories and op
ti
ons
7.1 Fi
tti
ng an an
ti
-bending console
Fig. 67
- Plan a concrete belt using a 350 Kg cement per m
3
concrete
mix with a size of w 25 cm x h 40 cm x l 100 cm using at least
0.10 m
3
to stabilise the
fi
xture of the an
ti
-bending console.
- Place the an
ti
-bending console on the edge and against the
rear wall of the pool.
- Mark the edges.
- Install the arm (1) horizontally by correctly placing the
ver
ti
cal part of the bracket (2) against the pool wall (3).
- Install the wedges under the horizontal plate if there is a
liner a
tt
achment rail for example, or behind the ver
ti
cal
support to deliberately give an angle to the console in order
to obtain a horizontal beam once the duckboard walkway
is in place.
- A more accurate adjustment of the beam height is carried
out using the bracket's oblong holes (4) and must maintain
the bo
tt
om of the suppor
ti
ng brackets 4 cm above the
water line.
7.2 Fixture on the edges
7.2.1 Fixing
the
fl
anges to the edge.
Fig. 68
- Assemble the stainless steel
fi
xing plate with the cover
using the M10 nuts and washers.
- Use the stainless steel supports as a template to mark
the posi
ti
on of the 4
fi
xing holes on each side of the pool
(they must be carried out as close as possible to the pool
depending on the structure's reinforcement elements)
- Drill 12 mm diameter holes at a depth of 70 mm.
- Manually screw the brass plugs to the TFHC M10x60
screws through the stainless steel plate.
- Hammer the heads of the TFHC M10x60 screws using
a mallet in order to insert them into the concrete belt.
- Tighten and check that the
fi
xtures hold.
- If necessary used the supplied wedges to ensure that
the edge plates are horizontal.
7.2.2 Fixing the sliders to the edge
Fig. 69
- Assemble the stainless steel
fi
xing plate to the slider using
the stainless steel studs on the top part of the slider.
- Use the stainless steel supports as a template to mark
the posi
ti
on of the 2
fi
xing holes on each side of the
pool.
- Drill 10 mm diameter holes at a minimum depth of 60
mm.
- Manually screw the brass plugs to the TFHC M8x55
screws through the stainless steel plate.
- Strike the heads of the TFHC M8x55 screws using a
mallet in order to insert them into the concrete belt.
- Tighten and check that the
fi
xtures hold.
- The beam box is
fi
tt
ed to the slider using M8 nuts.
7.2.3 Fixing the beam boxes to the edges
- Make sure that the height adjustment of the bo
tt
om of the
duckboard corresponds to your needs.
- The
fi
xture to the edge of the 120 mm beam makes it
possible to place this face 11 mm above the edge and
up to - 8 mm.
- The
fi
xture to the edge of the 80 mm beam makes it
possible to place this face 5 mm above the edge and up
to - 13 mm.
- Assemble the stainless steel
fi
xing plate to the ver
ti
cal
beam box support using the stainless steel studs in the
upper part of the ver
ti
cal support.
- Use the stainless steel supports as a template for step
3.2.5 of the assembly and marking.
- Make two
fi
xtures on each side.
7.3 Chemical sealing with inserts
- For M8 screws, drill to a diameter of 14 mm and depth of
65 mm,
- For M10 screws, drill to a diameter of 20 mm and depth of
70 mm,
- Clean the holes by blowing.
- Inject a dose of chemical sealer and place the insert,
- Respect the drying
ti
me indicated on the cartridge.
Fig. 67
1
2
3
4
Fig. 68
Fig. 69