Page 44/112
GEO
S12
HARDWARE SETUP PROCEDURE
•
(7) Flip the cluster upside down to access connector plates located on the down side;
•
(8) Repeat all above steps from #2 to #6;
•
(9) Position the two “U” brackets from GEOS12-ABRK kits on the outer cabinets next the angle
plates, and tight them to the cabinets using the shoulder screws provided with these kits,
•
(10) Four screws 12mm diameter (not provided) are required to secure the “U” brackets under
the ceiling;
Содержание GEO S12 Series
Страница 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Страница 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Страница 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Страница 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Страница 105: ...TECHNICAL SPECIFICATIONS Page 105 112 8 mm 20 mm 13 4 8 GEO S12 Push Pins BLGEOS WEIGHT 0 032 KG 0 07 LBS ...
Страница 111: ...USER NOTES Page 111 112 15 USER NOTES ...