Installation
User Manual for AZ430 WAN Satellite Modem
2 INSTALLATION
2.1 Rack
Mounting
The equipment is designed to operate in a 19-inch rack system conform to IEC
60297. When mounted in a standard 19-inch equipment rack, make sure you
sustain it with L-profiles. Do not fix the modem with four front panel screws only,
since this will damage the modem and could result in self injury.
It is allowed to operate the equipment in transportable installations and vehicles
equipped with the means to provide a stable environment. Do not operate the
equipment on vehicles, ships or aircraft without the means of environmental
conditioning, as this may invalidate the safety compliance.
Mount the equipment in the rack in such a way that the amount of air flow required
to safely operate the equipment is not compromised.
2.2 Power
Supply
2.2.1 AC
Power
Supply
This equipment is provided with a protective earthing incorporated in the power
cord. Be careful to insert the mains plug only in a socket outlet provided with a
protective earth contact (TN type power supply). Any interruption of the protective
conductor inside or outside the equipment is likely to make the equipment
dangerous. Intentional interruption is prohibited.
Install and connect the equipment to the mains power supply system in compliance
with local or national wiring installation standards. Position the equipment so that
the mains supply socket outlet for the equipment is near the equipment and can
easily be accessed or that there are other suitable means to disconnect from the
mains supply.
The power supply is set to operate from 100 to 240Vac to 47-63Hz.
2.2.2
Cable Distribution System
Install the equipment in accordance with the applicable provisions of NEC Article
810 for US and with CEC section 54 for Canada. Before connecting the coax to the
equipment, make sure that the equipment is properly earthed. The screen of the
used coax cable should be grounded according to the local regulations.
version 1.0
3
SHAPING THE FUTURE OF SATELLITE COMMUNICATIONS