background image

15272 Newsboy Circle

Huntington Beach

California 92649

   

  

Phone:  714-751-0488  

     Fax: 714-896-9679 

     E-Mail: [email protected]

2

www.newmartelecom.com

2.0 Overview

2.1 General Description

Your NEWMAR Site Power Monitor, model SPM-200, web-enables and integrates intelligence to any site’s AC 

and DC power system for 24/7 monitoring, alarm condition notification, and data logging of vital electrical 

functions. All sensor inputs are programmable, accessible, and managed via the Internet: TCP/IP or SNMP. 

View current conditions and log 30 day history of DC and AC power status at remote sites before dispatching 

personnel.

 

The SPM-200 is designed specifically for monitoring power supplies, rectifiers, batteries, converters, inverters, 

UPS, power distribution panels, and AC power at communication sites, base stations, outdoor enclosures and 

command vehicles via Ethernet or Wireless connection. The unit can be rack, DIN-rail, or wall mounted and is 

easily adapted to virtually any make of power system via nine sensor input ports which capture and stream 

critical data via the internet for analysis and logging of site history. Web page based programs are easily 

user configured for site parameters with up to 50 desired alarm conditions settings and multiple automatic 

notification options by e-mail, PDA, and mobile phone via text messaging.

Sites without internet access can use the monitor solely as a data logging instrument that captures and retains 

a 30 day history file, ready for download to a spread sheet on a lap top computer during maintenance visits 

for recording site history and analysis of component performance and failure conditions.

2.15 Front Panel LED Indicators

Status: 

Flashes on when polling sensor inputs. Approximated once every 5 seconds. 

Power:

 Illuminates when DC input power is present

 

2.2 Sensor Inputs

In addition to a built-in temperature sensor, the SPM offers the following 9 sensor ports:

2.2.1 

Voltage 

      

         DC: 3 Ports: 

 

 

 

 

 

 

• 2 each 0 to +40 VDC  (Negative Ground),  typ6, +12, +24V systems 

 

 

• 1 each 30-60 VDC (Positive Ground), typically -48V systems

CAUTION:

 If you intend to power -48 VDC 

AND

 monitor -48 VDC, input power 

must

 come from an isolated  

DC converter. If you need one, we will provide it free of charge. Contact NEWMAR: 800-854-3906 or E-Mail: 

[email protected] and request model: 

48-12-1i Kit

 

     

 • 

Accuracy 

± 

3% 

    

         AC: 2 Ports: 

 

 

 

 

 

 

• 90-264 VAC utility power (L-N Single Phase) Floating 

 

• 90-135 VAC inverter output, Single Phase 

 

Note:

 This input can be used to monitor a second utility or generator source providing it’s a Line to  

 

Neutral source with grounded Neutral which must be connected to “INV IN (GND)” Terminal # 4  

 

WARNING!

 Inverter GND terminal 4 is common to all SPM grounds and returns.   

 

 

Accuracy ± 5%

 

    

         DC: 1 Port: 

 

 

 

 

 

 

• 100 amp/100mV differential shunt voltage (shunt included) 

 •

 

Accuracy ± 5% (offset available)

2.2.2 Current & Switch Inputs

        DC: 1 Port: 

 

 

 

 

• 100 amp/100mV differential shunt voltage (shunt included) 

 

• Read battery charge/discharge (-) current, or load current

         Dry Contact Switch Inputs: 3 ports 

 

• Possible uses: voltage loss, door open, water leak detection, smoke alarm, component failure,  

 

   breaker trip, high temperature, etc.

Содержание SPM-200

Страница 1: ...Huntington Beach California 92649 Phone 714 751 0488 Fax 714 896 9679 E Mail techservice newmarpower com www newmartelecom com Site Power Monitor Installation Operation Manual Model SPM 200 M SPM 200...

Страница 2: ...ion 5 Figure Table 1 Input Terminal Block Assignments 6 Figure 2 Simplified Install Wiring Guide 7 4 0 Set up Monitoring Data Logging 8 4 1 Basic Software Set up 8 4 1 1 InitialSet up 8 4 1 2 NICSet u...

Страница 3: ...16 Web Page Admin Info 19 5 3 8 Firmware Download Upload 19 Figure 17 Web Page Upload System Firmware 19 5 3 9 Test SNMP Trap Email 20 Figure 18 Web Page Test Buttons 20 5 4 Setting Account Names Pass...

Страница 4: ...ates See page 19 for details Link LED Pg 8 Ethernet Cross Over Cable Data Logging Connection Pg 5 Static IP Address Reset Button Pg 28 30 Link Activity LED Pg 5 Earth Ground Stud Pg 4 System Reset But...

Страница 5: ...day history file ready for download to a spread sheet on a lap top computer during maintenance visits for recording site history and analysis of component performance and failure conditions 2 15 Fron...

Страница 6: ...ectivity via RJ 45 plug 100 BaseT Static IP address SNMP manager software SPM 200 supports V2c 2 4 Materials Provided The following items are provided with the SPM 200 Qty 1 Screwdriver 1 Installation...

Страница 7: ...odate 14 28 AWG wire size ORANGE Pos 1 10 BLUE Pos 11 20 Make your wire connections to the pluggable terminal block first and then plug it into the mating connector on the SPM 200 being careful to mat...

Страница 8: ...on monitor that describe the specific functions of each circuit Some examples include Magnetic Door Switch Rectifier Alarms Smoke Alarms Battery Temp Alarms loss of voltage contact relay closure etc M...

Страница 9: ...res a relay or switch contact closure Short across inputs will indicate CLOSE Open circuit is OPEN Contact 2 12 A2RTN 13 A1 Measures a relay or switch contact closure Short across inputs will indicate...

Страница 10: ...1A Fuse 1A Fuse 1A Fuse 100 A 100 mV Shunt Neg 0 60 VDC Sense Pos 0 40 VDC Sense Pos 0 40 VDC Sense System Battery DC Input 11 60V Power Source or 48 12 1i Converter Input N C or N O Switch N C or N O...

Страница 11: ...can request the entire log be downloaded in CSV format which can be read by Microsoft Excel or similar analysis software 4 1 Basic Software Setup 4 1 1 Initial Setup This section will show how to do a...

Страница 12: ...twork card that you connected to the SPM and right click it and select Properties 5 Find and double click Internet Protocol TCP IP version 4 icon This opens a window that shows your cur rent network c...

Страница 13: ...nected a local PC to the SPM and displayed the initial home web page You have proved that your SPM 200 is functional and that you can connect to it with a web browser The next parts of the manual will...

Страница 14: ...FIGURE 6 Setting the Clock Select Manual GMT in the Set Clock Method pulldown Enter the date and time in the appropriate boxes The box asks for the time in GMT and the offset from GMT for your local...

Страница 15: ...the SPM 200 has enough room in its memory to store data over that time The memory is set up as a circular buffer if the SPM 200 has run for more than that time new data will replace the old on a firs...

Страница 16: ...its Temperature can be displayed in Fahrenheit or Celsius whichever you choose The clock has been set This unit has been running for a while so it displays a graph of all the data This graph is config...

Страница 17: ...both SNMP traps will be triggered We ll see how to set the email addresses and SNMP traps on the Configuration Page later Each alarm can send emails to any combination of the 5 email addresses and 2 S...

Страница 18: ...le and general way to store data in a file Most analysis programs such as Microsoft Excel can read CSV data So you can download all the data in memory and analyze it with Excel FIGURE 11 Display Page...

Страница 19: ...rds 5 3 1 1 AC Voltage Offset The Line Voltage input allows you add on offest voltage to compensate for inaccuracy For example if line voltage measurement is low by 10 volts add 10 to this box and cli...

Страница 20: ...addresses be the same but there s no reason you can t set it that way Again don t forget to click the Save button To verify email has been set up properly click on Save and Test to receive a test emai...

Страница 21: ...provided with the SPM 200 or at www newmartelecom com Site_Power_Monitor Firmware_Update Firmware html If an SNMP Management System is running on your network contact your system administrator for in...

Страница 22: ...and unzip it Then navigate to the Firmware Update section of the Config page and click the Choose File button Navigate to the directory that you unzipped the package into and double click on the file...

Страница 23: ...ouble while updating please DO NOT reset your SPM and contact us at Phone 800 354 3906 Email techservice newmarpower com This next section is fairly self explanatory 5 3 9 Test SNMP Trap Email FIGURE...

Страница 24: ...n Administrator account the unit will now ask you to log in with that username and password before you can continue As always don t forget to click the Save button when you re done At this point you h...

Страница 25: ...just entered It will NOT respond at 192 168 1 123 anymore See 8 0 Appendix A Troubleshooting 13 which describes the Reset button to function and use If you are sure you have the correct settings go a...

Страница 26: ...current or load current o Accuracy 5 Dry Contact Switch Sensors 3 ports o Possible uses include door open water leak detection smoke alarm component fail breaker trip etc Temperature Sensor o Located...

Страница 27: ...powder coat Size 2 18 x 3 27 x 4 66 Weight 1 lb Mounting options Wall mount Din rail 19 or 23 inch rack mount via optional kit Input Ports Screw terminals 14 28 AWG wire Environmental Operating Temper...

Страница 28: ...s How can we find it The simplest thing to do is to reset the SPM The IP Reset Button is located directly under the RJ45 Ethernet connector on the side of the SPM To perform a simple reset use a paper...

Страница 29: ...SPM 200 11 I have not been able to get a SNMP trap from the unit A SNMP manager must be configured to receive traps from the unit Most SNMP programs have a database of traps they are monitoring for T...

Страница 30: ...t you have set This is useful if you have forgotten the IP address you set See Troubleshooting 4 for more information 14 Information not saved Form data not saved will be visible at the top of the pag...

Страница 31: ...oy Circle Huntington Beach California 92649 Phone 714 751 0488 Fax 714 896 9679 E Mail techservice newmarpower com 28 www newmartelecom com 10 0 Appendix B1 Typical System Wiring Negative Ground Float...

Страница 32: ...boy Circle Huntington Beach California 92649 Phone 714 751 0488 Fax 714 896 9679 E Mail techservice newmarpower com 29 www newmartelecom com 11 0 Appendix B2 Typical System Wiring Negative Ground Comm...

Страница 33: ...boy Circle Huntington Beach California 92649 Phone 714 751 0488 Fax 714 896 9679 E Mail techservice newmarpower com 30 www newmartelecom com 12 0 Appendix B3 Typical System Wiring Positive Ground Comm...

Отзывы: