NewMar Phase Three PT-24-40 Скачать руководство пользователя страница 22

U.S.A. HEADQUARTERS

P.O. Box 1306, Newport Beach, CA 92663

Phone: 714-751-0488  Fax: 714-957-1621

E-Mail: [email protected]

EURO WAREHOUSE

Phone:+31-35-603-2494

Fax:+31-35-603-2149

www.newmarpower.com

E

LECTRONIC

 P

OWER

 P

RODUCTS

C

OMMUNICATION

 

!

!

!

!

!

 N

AVIGATION

22

VIII)

BATTERY CARE TIPS

Regular maintenance and proper care will assure you reliable service from the most
depended upon and sometimes most neglected items, your batteries and battery
charger. NEWMAR battery chargers are designed to keep your batteries fully charged
but your batteries also need proper regular maintenance to provide a maximum life of
service.

ALWAYS READ AND FOLLOW THE BATTERY MANUFACTURER’S INSTRUCTIONS

Battery Installation

Batteries must be securely mounted to prevent them from falling over when the vehicle
or boat is in motion. A loose battery can do serious damage. Batteries should be
mounted in a battery box  to contain any acid spill. Batteries give off a certain amount
of hydrogen gas when they are charging. When concentrated, this gas is highly explo-
sive. Therefore make sure they are in an accessible place with adequate ventilation for
any hydrogen gas discharge.

Cleaning Batteries

Dirt and electrolyte salts can build up on the top of your batteries. This accumulation
conducts electricity stored in the battery and can cause the battery to discharge by
itself. Therefore, at least twice a year, it is a good idea to disconnect the battery cables
and scrub the battery with a baking soda solution. Rinse with fresh water and dry with
a clean cloth.

You may wish to purchase a set of terminal post corrosion prevention rings. These are
alkali-saturated felt rings that slip over the battery post to reduce corrosion. Do not
apply grease to any part of the battery terminals, but you may use an occasional light
spray of silicone lubricant.

Routine Checks and Maintenance

Batteries should periodically be “exercised” (slowly discharged and then recharged) to
keep them in top condition. New batteries may need to be exercised before they will be
capable of their full rating.

If your batteries are not the sealed type, distilled water should be added to them when-
ever needed. The electrolyte should cover the plates by about 1/2", allowing a small air
space at the top. Do not fill the cells up to the filler cap as this could cause the battery
to sputter out electrolyte when it is being charged. Only distilled water should be used
never plain tap water. Tap water contains chemicals and elements that can alter the
properties of the electrolyte, including specific gravity. Some chemicals may also create
an insulating coating on the battery plates which will retard current flow.

The rate that water is lost by the battery is dependent on several factors; battery condi-
tion, ambient temperature, battery use, charge voltage, etc. It is normal for batteries

Содержание Phase Three PT-24-40

Страница 1: ...B Location 5 C Mounting 6 D d c Output Wiring 6 E Multiple Unit Parallel Wiring 8 F a c Input Wiring 8 IV OPERATION 10 A Three Stage Charge Regimen 10 B Time Out Circuit 11 C Gel Cell Lead Acid Select...

Страница 2: ...based on battery type Multiple output banks charge independently based on demand Universal input of 90 264V a c 50 60 Hz input with no setting of selector switch required can be used anywhere in the...

Страница 3: ...ended or sold by NEWMAR may result in a risk of fire electric shock or injury to persons 6 To reduce the risk of damage to the electric plug and cord if plugged into an a c outlet pull by plug rather...

Страница 4: ...low a spark or flame in the vicinity of the battery or engine 6 Be extra cautious to reduce the risk of dropping a metal tool onto the battery It might spark or short circuit the battery or other elec...

Страница 5: ...isfaction card has been included in the packaging Upon completion of the installation please fill out this card and return it to the factory You will be contacted promptly if you have any problems wit...

Страница 6: ...hat required for the d c current carrying conductors and not less than 16 AWG Make a mark on the wall or bulkhead where each of the keyhole slots will be located Then drive a screw about halfway in at...

Страница 7: ...fuse The fuse is not user replaceable If this fuse blows the unit must be returned to NEWMAR or a qualified electronic technician for repair Typical d c wiring configurations are illustrated in FIGUR...

Страница 8: ...rger may be wired in parallel The unit is diode protected so it will not be damaged by feedback from the second unit and current limiting will prevent overloading in the case of a failure of one of th...

Страница 9: ...rd of equal or larger AWG rating with stranded not solid conductors Remove the a c input terminal cover by removing one front panel and two bottom panel screws Loosen the strain relief to slide the co...

Страница 10: ...tinues until battery voltage reaches the charge voltage level where batteries are at about 75 80 of capacity A cur rent limit circuit prevents charger overload during this maximum output stage Note Du...

Страница 11: ...he charger or when the reinitialize button on the optional remote panel is activated and runs for a pre set interval before forcing the charger to go into the float lower voltage mode The functioning...

Страница 12: ...efore timing out or counter clockwise to decrease the amount of time The approximate ranges are illustrated below FIGURE 5 Adjusting the Time out Circuit Note Once the time out circuit has put the cha...

Страница 13: ...remote location Red and green L E D s indicate whether the charger is in the bulk absorption or float phase of the charge cycle In addition the panel features a re initialize button which when presse...

Страница 14: ...gel cell batteries The remote sensor is provided with 30 of cable One end of the cable is plugged into the temperature compensation jack which is located on the right side of the charger See FIG URE...

Страница 15: ...rger when batteries are at 72 F or when the sensor is not installed and at cold 50 F or hot 90 F battery temperatures with the sensor installed F Equalize Timer Option Some manufacturers of flooded le...

Страница 16: ...s instructions when deciding the appropriate time period setting for this voltage to achieve proper equalization while ensuring batteries are not damaged by increased battery temperature This install...

Страница 17: ...with the molded arrow at the top of the fan facing away from the plate 7 Reconnect the in line wire assembly and slide the fan back into the charger taking care to fit the assembly between the guides...

Страница 18: ...Refer to Specifications section for continuous duty ratings at 115V and 230V While the charger cannot be damaged by over loads that exceed this continuous rating excessive load demands may draw batte...

Страница 19: ...mum in Bulk Phase 65 amps maximum in Absorption Float Phases PT 24 40 40 amps maximum in Bulk Phase 36 amps maximum in Absorption Float Phases Output Current 115V a c Input PT 70a 65 amps maximum in B...

Страница 20: ...harger will output minimal amperage to fully charged batteries 2 Check for shorted cell in wet lead acid batteries using a hydrometer Refer to manu facturer for testing mainte nance free batteries 1 R...

Страница 21: ...ed across charger output termi nals F Charger will not stay in bulk absorption phase when re initialize button on remote panel is pressed G Maximum output of charger is 35 amps model PT 70a or 20 amps...

Страница 22: ...he battery to discharge by itself Therefore at least twice a year it is a good idea to disconnect the battery cables and scrub the battery with a baking soda solution Rinse with fresh water and dry wi...

Страница 23: ...ccept or hold a charge one of the following conditions may exist 1 A BAD BATTERY You may have a battery with an open or shorted cell a battery without any life left Check by charging the battery until...

Страница 24: ...moved IX REFERENCE APPENDIX For more information about boat wiring to conform to U S Coast Guard regula tions write Superintendent of Documents Government Printing Office Washington DC 20402 Request 3...

Отзывы: