NewMar Phase Three PT-24-40 Скачать руководство пользователя страница 11

U.S.A. HEADQUARTERS

P.O. Box 1306, Newport Beach, CA 92663

Phone: 714-751-0488  Fax: 714-957-1621

E-Mail: [email protected]

EURO WAREHOUSE

Phone:+31-35-603-2494

Fax:+31-35-603-2149

www.newmarpower.com

E

LECTRONIC

 P

OWER

 P

RODUCTS

C

OMMUNICATION

 

!

!

!

!

!

 N

AVIGATION

11

*

FIGURE 4: Typical Charger Output Graph (into battery without load

)

 * Approximately 10 hours maximum at factory setting.

Note: If a load is applied during the absorption phase, the charger may revert to the bulk phase
depending on the total current draw. When the charger switches to the float phase, it will
remain in that phase regardless of current draw. The charger is still able to deliver full output
current when in the float phase. To re-initialize the three stage process shut the charger off
momentarily, then back on again (or press the reinitialize button on the optional remote panel)

B) Time-Out Circuit

Batteries have a tendency to lose their electrolyte and may be damaged if they are main-
tained for long periods of time in the elevated voltage of the absorption phase. Therefore, the
Phase Three Charger employs a special time-out circuit. This circuit is initialized each time
a.c is first applied to the charger (or when the reinitialize button on the optional remote
panel is activated) and runs for a pre-set interval before forcing the charger to go into the
float (lower voltage) mode. The functioning of the charger during this interval is as follows:

If the current demand of the batteries/load falls below 5-15 % of the charger’s output capac-
ity prior to the circuit timing-out, the charger will automatically switch to the float mode. If
demand rises to about 10-20 % of charger output capacity, it will return to the elevated
output voltage of the absorption phase. This switching back and forth between modes may
occur until the circuit times-out (8-10 hours after a.c. is first applied), after which the
charger will remain at float voltage,  until the circuit is re-initialized, either by turning the
charger off and then on again or by presssing the re-initialize button on the optional remote
panel.

Installation Note: The time-out circuit of the PT charger has been set at about 8-10 hours,
which is appropriate for battery systems within the capacity range specified on the front
panel of the charger. If the charger is used with a battery system with a capacity near (or
outside) the upper or lower ranges of the specified range of the charger, adjustment of the
internally located time-out circuit adjustment pot may be recommended. The procedure is as
follows:

Содержание Phase Three PT-24-40

Страница 1: ...B Location 5 C Mounting 6 D d c Output Wiring 6 E Multiple Unit Parallel Wiring 8 F a c Input Wiring 8 IV OPERATION 10 A Three Stage Charge Regimen 10 B Time Out Circuit 11 C Gel Cell Lead Acid Select...

Страница 2: ...based on battery type Multiple output banks charge independently based on demand Universal input of 90 264V a c 50 60 Hz input with no setting of selector switch required can be used anywhere in the...

Страница 3: ...ended or sold by NEWMAR may result in a risk of fire electric shock or injury to persons 6 To reduce the risk of damage to the electric plug and cord if plugged into an a c outlet pull by plug rather...

Страница 4: ...low a spark or flame in the vicinity of the battery or engine 6 Be extra cautious to reduce the risk of dropping a metal tool onto the battery It might spark or short circuit the battery or other elec...

Страница 5: ...isfaction card has been included in the packaging Upon completion of the installation please fill out this card and return it to the factory You will be contacted promptly if you have any problems wit...

Страница 6: ...hat required for the d c current carrying conductors and not less than 16 AWG Make a mark on the wall or bulkhead where each of the keyhole slots will be located Then drive a screw about halfway in at...

Страница 7: ...fuse The fuse is not user replaceable If this fuse blows the unit must be returned to NEWMAR or a qualified electronic technician for repair Typical d c wiring configurations are illustrated in FIGUR...

Страница 8: ...rger may be wired in parallel The unit is diode protected so it will not be damaged by feedback from the second unit and current limiting will prevent overloading in the case of a failure of one of th...

Страница 9: ...rd of equal or larger AWG rating with stranded not solid conductors Remove the a c input terminal cover by removing one front panel and two bottom panel screws Loosen the strain relief to slide the co...

Страница 10: ...tinues until battery voltage reaches the charge voltage level where batteries are at about 75 80 of capacity A cur rent limit circuit prevents charger overload during this maximum output stage Note Du...

Страница 11: ...he charger or when the reinitialize button on the optional remote panel is activated and runs for a pre set interval before forcing the charger to go into the float lower voltage mode The functioning...

Страница 12: ...efore timing out or counter clockwise to decrease the amount of time The approximate ranges are illustrated below FIGURE 5 Adjusting the Time out Circuit Note Once the time out circuit has put the cha...

Страница 13: ...remote location Red and green L E D s indicate whether the charger is in the bulk absorption or float phase of the charge cycle In addition the panel features a re initialize button which when presse...

Страница 14: ...gel cell batteries The remote sensor is provided with 30 of cable One end of the cable is plugged into the temperature compensation jack which is located on the right side of the charger See FIG URE...

Страница 15: ...rger when batteries are at 72 F or when the sensor is not installed and at cold 50 F or hot 90 F battery temperatures with the sensor installed F Equalize Timer Option Some manufacturers of flooded le...

Страница 16: ...s instructions when deciding the appropriate time period setting for this voltage to achieve proper equalization while ensuring batteries are not damaged by increased battery temperature This install...

Страница 17: ...with the molded arrow at the top of the fan facing away from the plate 7 Reconnect the in line wire assembly and slide the fan back into the charger taking care to fit the assembly between the guides...

Страница 18: ...Refer to Specifications section for continuous duty ratings at 115V and 230V While the charger cannot be damaged by over loads that exceed this continuous rating excessive load demands may draw batte...

Страница 19: ...mum in Bulk Phase 65 amps maximum in Absorption Float Phases PT 24 40 40 amps maximum in Bulk Phase 36 amps maximum in Absorption Float Phases Output Current 115V a c Input PT 70a 65 amps maximum in B...

Страница 20: ...harger will output minimal amperage to fully charged batteries 2 Check for shorted cell in wet lead acid batteries using a hydrometer Refer to manu facturer for testing mainte nance free batteries 1 R...

Страница 21: ...ed across charger output termi nals F Charger will not stay in bulk absorption phase when re initialize button on remote panel is pressed G Maximum output of charger is 35 amps model PT 70a or 20 amps...

Страница 22: ...he battery to discharge by itself Therefore at least twice a year it is a good idea to disconnect the battery cables and scrub the battery with a baking soda solution Rinse with fresh water and dry wi...

Страница 23: ...ccept or hold a charge one of the following conditions may exist 1 A BAD BATTERY You may have a battery with an open or shorted cell a battery without any life left Check by charging the battery until...

Страница 24: ...moved IX REFERENCE APPENDIX For more information about boat wiring to conform to U S Coast Guard regula tions write Superintendent of Documents Government Printing Office Washington DC 20402 Request 3...

Отзывы: