background image

P.O. Box 1306

Newport Beach

California 92663

   

  

Phone: 714-751-0488  

     Fax: 714-957-1621

     E-Mail: [email protected]

www.newmartelecom.com

Topic

Page

Quick Reference Guide.............................................

2

Operational Features Summary...............................

3

Materials Provided....................................................

3

Installation................................................................

3

Mechanical
Power Wiring
Signal Wiring
Motorola Output Settings: Default and Optional

Operation................................................................

4

Status LEDs
Disconnect Timer (TMR) Operation
Advanced Settings: Backup Timer, Trigger 

Threshold, and Hysteresis

Battery Replacement..............................................

8

Test/Troubleshooting..............................................

9

Specifications..........................................................

9

Dimensional Drawing.............................................

10

Mobile Data Power

Model: MDP-25.0

Installation/Operation 

M-MDP25.0

As of 041714

Содержание MDP-25.0

Страница 1: ...Materials Provided 3 Installation 3 Mechanical Power Wiring Signal Wiring Motorola Output Settings Default and Optional Operation 4 Status LEDs Disconnect Timer TMR Operation Advanced Settings Backup...

Страница 2: ...Fax 714 957 1621 E Mail techservice newmarpower com www newmartelecom com Quick Reference Guide Status LEDs Page 5 Status LED Legend Page 5 D Sub 9 Pin Motorola Interface Page 4 Input Output Wiring P...

Страница 3: ...engine is off Allows use of accessory loads per programmed time limit user adjustable while preserving battery for emergency starting Factory default is not active see page 5 Built in LVD Low Voltage...

Страница 4: ...nput wires by disconnecting the battery or shutting off the appropriate circuit Note the MDP functions as an uninterruptable power source If electronics are wired directly to the MDP output and the pr...

Страница 5: ...on of voltage occurs augmenting voltage to the electronics for 3 seconds If proper primary voltage is not restored within the 3 second time frame input from the vehicle battery disconnects and electro...

Страница 6: ...nce the battery voltage reaches approximately 14 2 volts the charging current will start to reduce The voltage will remain at 14 2 volts stage 2 high rate absorption charge until the current to the ba...

Страница 7: ...s 5 Note that the TMR feature is disabled if the Ignition IN pin Pin 2 of the D sub 9 pin connector on front panel see Figure 2 is connected to a voltage greater than 2 volts i e battery Back up funct...

Страница 8: ...internal battery see table 4 Hysteresis should be set after determined the amount of voltage drop from the DC source vehicle battery to input terminals of the MDP when the intended output load curren...

Страница 9: ...battery loosen and back out the four front Battery Access Plate securing screws and remove Battery Access Plate Once the plate is removed you will see the battery is secured in position by a Locking...

Страница 10: ...N If a problem persists after you have applied the above outlined solutions or if you have any questions about the installation and proper operation of the MDP 25 0 please contact NEWMAR s Technical S...

Страница 11: ...Box 1306 Newport Beach California 92663 Phone 714 751 0488 Fax 714 957 1621 E Mail techservice newmarpower com www newmartelecom com DIMENSIONAL DRAWINGS 6 980 8 460 5 400 4 750 300 6 000 281 x 4 5 79...

Отзывы: