
8
P.O. Box 1306
Newport Beach
California 92663
Phone: 714-751-0488
Fax: 714-957-1621
E-Mail: [email protected]
www.Newmarpower.com
Automation DC Power • Powering the Network
C) Time Buffering/Battery Run Time
This function determines how long the reserve battery will power the system in the event of AC failure. You may choose a
specifi ed time or run until the LVD activates.
Settings: dial in time interval of desired run time of battery without disconnect. Using small screw driver to set the dial
arrow to the desired setting:
a. 1 - 60 minutes
or
b. Set at zero for battery run until LVD activates @ 18 VDC (1.5 VPC)
Figure 11: Time Buffering/Battery Run Time - Dial
D) System Settings
Via plug-in jumper programing terminals located on top of the unit. Install jumper per illustration below to:
ii. Enable Battery Test
iii. Disable/Enable Load Priority
5) Operation
A) Battery Start without AC Present Push Button:
If system shuts down due to loss of AC and battery power, pushing button will allow battery to come on line to supply the
load. Press and hold for 3 seconds to re-connect battery to output. Note, if LVD has activated and battery voltage has not
recovered above disconnect point, the unit will not cycle on.
B) Status Indicator LED’s
1. Power source: Mains or back up
i. AC OK (AC Fail LED Off)
or
ii. Operating on battery backup power
(AC Fail LED On) red
2. Low battery, or battery replacement
LED illuminates when:
• Low Battery (capacity less than 30%)
• Bad connection to battery
• Battery requires replacement
3 diagnosis LED.
Charger output status system diagnosis and Fault mode diagnosis: by
blink code (Table 6 on next page).
Figure 12: Battery Start LED
Function Setting
Battery Test ON
Insert Jumper: Pos. 4
Pos. 4
Insert jumper at position 4 to enable Periodic Battery condition
test process. (Fault reported by LED diagnosis blink code, see
Table 6):
•
Battery wiring connection
•
Battery efficiency/sulfation (impedance tesst)
•
Shorted Cell
Load Priority Disable
(Makes full power
available
for charging)
Insert Jumper: Pos. 7
Pos. 7
Jumper inserted into position 7 making all power from the unit
available for battery charging by disabling the load priority
output function. Under low battery charge condition, output
voltage to load will be equal to that of the battery voltage, thus
useful voltage to the load will not be available until the battery
recovers to proper levels.
1 2 3 4 7
5
6
1 2 3 4 7
5
6
Figure 13: Status Indicator LEDs
1
2
3
MIN
MAX
L
N
(3)
(4)
BATTRY
INPUT
BATTERY
CHARGING LEVEL
i
AC
FAIL
LOW BATTERY
OR BATTERY
REPLACEMENT
DIAGNOSIS
BATTERY
START
TIME
BUFFERING
0 1 2
345
67
8 9
A
U
X
3
OUTPUT LOAD
(1)
(2)
BATTERY
SELECTION
AC
FAIL
LOW BATTERY
OR BATTERY
REPLACEMENT
5 6 7 8 9 10
JUMPER FOR
115 Vac
DIN-UPS 12-35
OUTPUT: 12Vdc 35A
INPUT: 115-230Vac
T
E
M
P
P
R
O
B
E
C
O
M
M
O
D
B
U
S
(714) 751-0488
Www.automationdcpower.com
Newport Beach, CA USA