background image

 

 

Page 8

 

¾

  Please check that the input DC voltage meets the VDC specification of the inverter, and verify the correct DC 

polarity connections have been made to the inverter. 

¾

  Connect the DC input voltage cables before engaging the front panel DC breaker. 

¾

  Use the following recommended cable sizes when connecting power to the inverter.   

 

Model

 

Capacity DC Input AC Input

AC Output 

24-1000RM 

1 KVA 

#6 AWG  #12 AWG

NEMA 5-15R 

48-1000RM 

1 KVA 

#10 AWG  #16 AWG

NEMA 5-15R 

48-2000RM 

2 KVA 

#6 AWG  #12 AWG NEMA 5-20R/5-15R 

48-1000IRM 

1 KVA 

#10 AWG  #16 AWG

IEC-320 

48-2000IRM 

2 KVA 

#6 AWG  #12 AWG

IEC-320 

125-1000RM 

1 KVA 

#12 AWG  #16 AWG

NEMA 5-15R 

125-2000RM 

2 KVA 

#12 AWG  #12 AWG NEMA 5-20R/5-15R 

 
4-3 Installation Tool Kit 

 
Contents of the tool kit include:   

  Poly zip bag containing twelve M4 screws and two 6-32 screws,  

  Two large mounting brackets (23” or 24” rack mount),  

  Two small mounting brackets (19” rack mount),  

  One protective cover for AC input,  

 One 

RS232 

Cable. 

 

4-4 Locking Hardwire Adapter 

 

¾

  The optional adapter is a reliable locking NEMA 5-15 plug on one end and terminal screws on the other end.  

The plug-to-terminal conversion is used to secure bare wire load circuit wiring to the output sockets of the 
inverter.  The adapter includes strain relief for the wires being connected to the terminals.

 

 

Documents Also Available

: Application Note # AN-001   

 

5. OPERATION 

 

5-1  Connecting to the Input Power 

¾

  Turn off the DC breaker before connecting the DC voltage to the input terminal.  The DC terminal strip will 

accommodate ring terminals with wire sizes recommended in Chapter 4-2.  

 

¾

 

NOTE: 

Sparks will occur if the breaker is “on” when connecting the input DC voltage. This is a normal condition 

due to the charging current draw from the DC voltage charging the internal capacitor of the inverter.  

¾

  Once the DC power has been connected, engage the DC breaker to operate the inverter.   

 
 

5-2  Connecting the Loads 

¾

  Calculate the total power consumption (VA) of the load being attached to the output. Make sure that the total 

power consumption does not exceed the rated load of the inverter. 

¾

  The load consumption can be monitored on the front screen of the inverter using the data button. 

¾

  Should the total load exceed the capacity of the inverter, remove uncritical loads until the total load is within the 

capacity of the inverter.  Distribute removed loads to alternate sources or additional inverters 

Содержание 125-1000RM

Страница 1: ...INSTALLATION OPERATION MANUAL MODELS 24 1000RM 48 1000RM 48 1000IRM 48 2000RM 48 2000IRM 125 1000RM 125 2000RM Newmar 2911 W Garry Ave Santa Ana CA 92704 Tel 714 751 0488 Fax 714 957 1621 As of 8 11...

Страница 2: ...THE INPUT POWER 8 5 2 CONNECTING THE LOADS 8 5 3 FRONT PANEL OPERATION OF SEQUENCE SOFTWARE VERSION 0 0 OR 3 1 9 5 3A PROGRAMMING THE INVERTER SOFTWARE VERSION 0 2 OR 1 0 9 5 4 DATA BUTTON 9 5 4 DATA...

Страница 3: ...l be read attentively to insure safe and reliable operation of this equipment Should you require any assistance please call our Application Engineering department at Tel 800 854 3906 or 714 751 0488 F...

Страница 4: ...rounding of rack mounted equipment should be maintained Inverter DC power connection must be from a VDC source within the technical specifications of the unit under installation 2 3 Symbols PROTECTIVE...

Страница 5: ...first option Off Line mode AC output power will be supplied through the AC bypass mode in its normal operation Upon AC input failure output power will be diverted through the DC to AC inverter mode O...

Страница 6: ...frequency etc and system status can be shown sequentially on the LCD display by pressing these two buttons For more information Refer to Section 5 Operation Ventilator The ventilator on the front pane...

Страница 7: ...ce panel AC I P neutral to earth connection provided externally Usually service panel Operation On Line Mode DC input supplied from battery DC power system Inverter originated AC therefore neutral to...

Страница 8: ...plug to terminal conversion is used to secure bare wire load circuit wiring to the output sockets of the inverter The adapter includes strain relief for the wires being connected to the terminals Docu...

Страница 9: ...than 1 second the CPU will not start up correctly The inverter is in a normal operation condition when either of the following messages appear on the LCD screen 5 3a Programming the Inverter The INVER...

Страница 10: ...verter voltage INVERTER VOLT V C Output frequency Shows present output frequency OUTPUT FREQ Hz D Bypass AC voltage Shows present input bypass AC voltage BYPASS AC VOLT V E Bypass AC frequency Shows p...

Страница 11: ...TUS button to select the following information which is displayed on the LCD screen A Output status a When the input bypass voltage is normal and INVERTER output voltage is from DC to AC inverter LCD...

Страница 12: ...CD shows AMBIENT OVER TEMPERATURE d When the INVERTER output is in short circuit detection mode LCD shows INVERTER SHORT CIRCUIT e When the INVERTER output is overloaded beyond rated capacity LCD show...

Страница 13: ...the input bypass is over normal frequency range LCD shows BYPASS AC OUT OF FREQ f When the output is overloaded LCD shows BYPASS AC OVER LOAD D Input DC status a When the input DC voltage is normal IN...

Страница 14: ...VAILABLE EEPROM checksum error 6 MAINTENANCE AND TROUBLESHOOTING 6 1 Maintenance Make sure that the inverter vents are not blocked Use a vacuum cleaner to clear any dust from the fan area When cleanin...

Страница 15: ...95Vac 135Vac 100Vac 140Vac AC Bypass Frequency Range F 50Hz 45 5Hz 54 5Hz AC Bypass Frequency Range F 60Hz 55 5Hz 64 5Hz AC Bypass Recovery From Over Voltage 115Vac 125Vac 130Vac 135Vac AC Bypass Rec...

Страница 16: ...requirement to manage multiple network elements from a central location SNMP remote access as easy as installing the plug n play card configuring your network IP address and attaching the network inte...

Страница 17: ...1KVA 800W Voltage 100 110 115 120 VAC Voltage Regulation 2 Frequency 50 60Hz 0 2Hz Wave Form Pure Sine Wave THD linear load 3 120 V 100 THD SPS load 5 120 V 100 Crest Factor 3 1 Receptacles 4 NEMA 5 2...

Страница 18: ...20 V 100 THD SPS load 5 120 V 100 Crest Factor 3 1 Receptacles 4 NEMA 5 15 R outlets Utility Power Bypass Voltage Nominal 120 VAC Frequency 50 60 5 Hz Protection AC Circuit Breaker Protection Short Fo...

Страница 19: ...120 V 100 THD SPS load 5 120 V 100 Crest Factor 3 1 Receptacles 4 NEMA 5 20 R outlets Utility Power Bypass Voltage Nominal 120 VAC Frequency 50 60 5 Hz Protection AC Circuit Breaker Protection Short F...

Страница 20: ...120 V 100 THD SPS load 3 120 V 100 Crest Factor 3 1 Receptacles 4 NEMA 5 15 R outlets Utility Power Bypass Voltage Nominal 120 VAC Frequency 50 60 5 Hz Protection AC Circuit Breaker Protection Short...

Страница 21: ...5 120 V 100 THD SPS load 3 120 V 100 Crest Factor 3 1 Receptacles 4 NEMA 5 20 R outlets Utility Power Bypass Voltage Nominal 120 VAC Frequency 50 60 5 Hz Protection AC Circuit Breaker Protection Short...

Страница 22: ...V 100 THD SPS load 5 120 V 100 Crest Factor 3 1 Receptacles 4 IEC 320 outlets C13 Utility Power Bypass Voltage Nominal 230 VAC Frequency 50 60 5 Hz Protection AC Circuit Breaker Protection Short For...

Страница 23: ...0 V 100 THD SPS load 5 120 V 100 Crest Factor 3 1 Receptacles 4 IEC 320 outlets C13 Utility Power Bypass Voltage Nominal 230 VAC Frequency 50 60 5 Hz Protection AC Circuit Breaker Protection Short For...

Страница 24: ...Page 24 Drawing No MPXXXNX02ABX...

Страница 25: ...iguring your network IP address and attaching the network interface cable Locking Hardwire Adapter Reliable locking NEMA 5 15 plug to secure load circuits to the output sockets of the inverter Heavy d...

Отзывы: