INSTALLATION, OPERATING
and
SERVICE MANUAL
THE INSTALLATION OF THE UNIT SHALL BE IN ACCORDANCE WITH THE
REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION.
OIL-FIRED HI-BOY – HEAVY DUTY FURNACES
MODELS: NH3 and LFR
HEAD OFFICE
MARKETING / PRODUCTION
Newmac Mfg. Inc.
208 LANCASTER CRESCENT
P.O. BOX 9, DEBERT
NOVA SCOTIA, BOM 1G0
PHONE: 902-662-3840
FAX:
902-662-2581
WAREHOUSE
Newmac Mfg. Inc.
430 SPRINGBANK AVE., SOUTH
WOODSTOCK, ONTARIO
N4V 1B2
PHONE: 519-539-6147
FAX:
519-539-0048
156156
EMAIL: [email protected]
WEB SITE: newmacfurnaces.com
NOTICE TO HOMEOWNER:
READ AND SAVE THESE INSTRUCTIONS
2210272 March 2010
Printed
:__________
Subject to change without notice
Содержание LFR-72
Страница 17: ...16 FIG 10 TYPICAL OIL TANK PIPING INSTALLATIONS...
Страница 18: ...17 FIG 11 DIMENSIONS CONTROL LOCATION NH3...
Страница 19: ...18 FIG 12 LFR SET UP...
Страница 20: ...19 FIG 13 STANDARD WIRING SCHEMATIC DIRECT DRIVE...
Страница 21: ...20 FIG 14 STANDARD WIRING SCHEMATIC A C READY DIRECT DRIVE...
Страница 22: ...21 FIG 15 STANDARD WIRING SCHEMATIC BELT DRIVE...
Страница 24: ...23 FIG 16 NH3 EXPLODED ASSEMBLY...
Страница 33: ...32 FIGURE 23 COMMON CHIMNEY DRAFT PROBLEMS...