New Yorker FR-147 Скачать руководство пользователя страница 24

24

111079-01 - 12/20

FR

Installation & Service Manual

3. CHECKOUT
  Put the system into operation and observe 

at least one complete cycle to make sure 

that the controller operates properly.  See 

Troubleshooting Section to use LED to assist in 

determining system operation.

E.  CHECK  OIL  BURNER  BEFORE  STARTING.
 

If a lower input is desired, remove the nozzle 

which was factory installed.  Locate the lower 

firing rate nozzle that is supplied loose.  Confirm 

the nozzle is the proper size and type for the 

lower firing rate as specified in Table 14-1 (at the 

rear of this manual).  Install the proper nozzle in 

the burner nozzle adapter.

 

Adhere the Conversion Rating Label for the 

selected model on the boiler jacket adjacent to 

the existing Rating Label on the boiler.
1.  CHECK BURNER SETTINGS and readjust if 

necessary, see Burner Specifications, Table 

14-1 at rear of manual.

2.  Beckett Burners

a.  Inspect Beckett head setting on left side 

of burner housing by insuring the blue line 

MD(V1) or the line on the label MB(L1) are 

aligned, readjust if necessary.  Refer to 

Figure 2-1 and Table 14-1 at the rear of this 

manual.

b.  Check burner air band and air shutter 

settings. Readjust if necessary, see Burner 

Specifications Table 13 at the rear of this 

manual.

c.  OPEN ALL OIL LINE VALVES.
d.  Attach a plastic hose to fuel pump vent 

fitting and provide a pan to catch the oil.

e.  OPEN FLAME OBSERVATION PORT  

COVER on burner swing door.

F.  START  OIL  BURNER.

1.  Open vent fitting on fuel pump.
2.  TURN  ‘ON’  BURNER  service switch and 

allow burner to run until oil flows from vent 

fitting in a SOLID stream without air bubbles 

for approximately 10 seconds.

3.  Close vent fitting and burner flame should 

start immediately after prepurge is completed.  

Prepurge prevents burner flame until 10 

seconds has elapsed after initial power is 

applied to burner.  During prepurge the motor 

and igniter will operate but the oil valve will 

remain closed.  Refer to Oil Primary Control 

Instructions for more details.

4.  Adjust oil pressure.

a.  When checking a fuel unit’s operating 

pressure, a reliable pressure gauge may 

be installed in either the bleeder port or 

the nozzle port.  For Beckett burner refer to 

Figure 8-1.

b.  Locate oil pressure adjusting screw and 

turn screw to obtain proper pump pressure, 

refer to Table 14-1 at the rear of this manual.

c.  To check the cutoff pressure, deadhead a 

reliable pressure gauge onto the copper 

connector tube attached to the nozzle port.  

Run the burner for a short period of time.  

Shut the burner off.  The pressure should 

drop and hold.

d.  Remove the gauge and install bleeder port 

and/or reconnect the nozzle port line.

G.  ADJUST  OIL  BURNER  WHILE  OPERATING.

  

(flame present)
1.  SET  ROOM  THERMOSTAT  about 10°F below 

room temperature.

2.  PRESS  RED  RESET  BUTTON  on Oil Primary 

Control and release.

3.  Beckett Burners

 - 

READJUST  THE  HEAD  

SETTING  only if necessary.
a. FR-HGS:

  Beckett MB(L1) Head burners have a fixed 

head which are non-adjustable. 

b.  FR-122E thru FR-232E:

  Beckett MD(V1) (variable) Head burners 

have the ability to control air by moving the 

head.  It might be necessary to move the 

head forward or back one position at a time 

to optimize the smoke and CO

2

  readings.  

Figure 8-1:  Adjusting Fuel Pump Pressure

8

 System Start-Up 

(continued)

Содержание FR-147

Страница 1: ...ng contractor When seeking information on boiler provide Boiler Model Number and Serial Number as shown on Rating Label Manual Contents Page 1 General Information 5 2 Pre Installation 7 3 Knockdown Bo...

Страница 2: ...operations of controls and safety devices operations of controls and safety devices D All wiring on boilers installed in the USA shall be made in accordance with the D All wiring on boilers installed...

Страница 3: ...stall Limit Sensor may result in property damage personal injury or loss of life due to elevated operating temperatures and or pressures This boiler is NOT suitable for installation on combustible flo...

Страница 4: ...chimney flue must be inspected and cleaned before the start of the heating season for any obstructions A clean and unobstructed chimney flue is necessary to allow noxious fumes that could cause injur...

Страница 5: ...01 12 20 FR Installation Service Manual Figure 1A FR HGS Water Boiler Heat Only Beckett Burner Figure 1B FR 122E Thru FR 232 Water Boiler With or Without Tankless Heater Beckett Burner 1 General Info...

Страница 6: ...Boiler Series Boiler Model Burner Capacity Heating Capacity MBH 2 Net Ratings Water MBH 3 AFUE Minimum Chimney Requirement GPH MBH 1 Round In Dia Rectangle In x In Height Ft FR HGS FRHGSL 0 80 112 100...

Страница 7: ...e Installation of Oil Burning Equipment NOTE 2 FR Series boilers can be installed in rooms with clearances from combustible material as listed above Listed clearances cannot be reduced for alcove or c...

Страница 8: ...ommunicating with the outdoors Locate one opening within 12 inches of top of space Locate remaining opening within 12 inches of bottom of space Minimum dimension of air opening is 3 inches Size each o...

Страница 9: ...lly insert limit sensor into immersion well such that the tip on the limit sensor touches the bottom of the immersion well See Figure 3 1 3 Mount burner to front fire door and wire according to instru...

Страница 10: ...Burner Spec Label Riello Burners 111083 01 5 Energy Guide Label 6 Limit Sensor Insertion Depth Warning Label 103106 03 7 ASME Cover Plate Label 81460041 Notes 1 Installation is Not complete unless al...

Страница 11: ...11 111079 01 12 20 FR Installation Service Manual Figure 3 4 Burner Mounting 3 Knock Down Boiler Assembly continued...

Страница 12: ...iping must be considered a If this boiler is used in connection with refrigeration systems the boiler must be installed so that the chilled medium is piped in parallel with the heating boiler using ap...

Страница 13: ...osition Installation of the relief valve must be consistent with ANSI ASME Boiler and Pressure Vessel Code Section IV WARNING Installation is NOT complete unless a safety relief valve is installed as...

Страница 14: ...14 111079 01 12 20 FR Installation Service Manual Figure 4 2 Recommended Water Piping for Circulator Zoned Heating Systems 4Water Piping and Trim continued...

Страница 15: ...15 111079 01 12 20 FR Installation Service Manual Figure 4 3 Recommended Water Piping for Zone Valve Zoned Heating Systems 4Water Piping and Trim continued...

Страница 16: ...articularly to well water An appropriate water softener should be installed based on the analysis and dealer s recommendation This is not only beneficial to the tankless heater but to piping and fixtu...

Страница 17: ...has been insulated and fitted with storm windows so that the heat loss of the home has been reduced This requires less fuel to be burned and sends 5Venting less heat up the chimney A new boiler proba...

Страница 18: ...vice Manual Figure 5 2 Draft Regulator Locations 5Venting continued c For the same reasons as in 2 above heat extractors mounted into the breeching are not recommended 3 For minimum clearances to comb...

Страница 19: ...ater pipes lighting fixtures television rays of the sun or near a fireplace Keep large furniture away from thermostat so there will be free movement of room air around this control Connect the thermos...

Страница 20: ...20 111079 01 12 20 FR Installation Service Manual Figure 6 1 Schematic Wiring Diagram without Tankless Heater Cold Start Control Beckett Burner 6 Electrical continued...

Страница 21: ...ly recommended B SINGLE PIPE OIL LINES 1 Standard burners are provided with single stage 3450 rpm fuel units with the bypass plug removed for single pipe installations Figure 7 1 Single Pipe Installat...

Страница 22: ...0 4 63 100 5 57 100 6 52 100 7 47 100 8 42 100 9 36 100 10 31 100 11 26 100 12 21 83 13 62 14 41 Table 7 2 Single Stage Units 3450 RPM Two Pipe Systems Table 7 3 Two Stage Units 3450 RPM Two Pipe Syst...

Страница 23: ...ed of air close zone valve or shut off valve Open zone valve to the next zone to be purged Repeat this step until all zones have been purged At completion open all zone valves i Close purge valve cont...

Страница 24: ...rner to run until oil flows from vent fitting in a SOLID stream without air bubbles for approximately 10 seconds 3 Close vent fitting and burner flame should start immediately after prepurge is comple...

Страница 25: ...be placed in a purge routine by See Figure 8 1 and Table 14 1 at the rear of this manual 4 ADJUST DRAFT REGULATOR for a draft of 0 02 water gauge over the fire after chimney has reached operating temp...

Страница 26: ...26 111079 01 12 20 FR Installation Service Manual Figure 8 2 L1 and V1 Head Electrode Positioning and Gun Setting Beckett AFG 8 System Start Up continued...

Страница 27: ...of unburned oil in the combustion area the control can only be reset three times The reset count returns to zero each time a call for heat is successfully completed v T T Jumper Select models have pre...

Страница 28: ...stance Reset safety switch Close line switch to boiler If burner starts and runs beyond safety switch cut off time cell is good If not install new cell Close hand valve in oil supply line Failure occu...

Страница 29: ...e systems 5 Recommended setting for Five zone systems HI Provides highest level of fuel savings E Optional Features NOTE The Program Mode Pro isaccessedbyturningtheLPTEMPdialtoa position just above OF...

Страница 30: ...l vs Standard Immersion Well When used to replace older temperature only controls the HyrdroStat can be installed on the existing well The Hydrolevel Elctro Well is required to activate low water cut...

Страница 31: ...Y to reset all features to the default settings 4 Reset LO TEMP and HI TEMP settings to desired temperatures 9 LED Legend and Test Settings Button a TEMP ACTIVE Indicates that the Fuel Smart HydroSta...

Страница 32: ...l the boiler temperature drops below the differential set point at which point the boiler will be allowed to fire again See Differential explanation NOTE This LED illuminates regularly during normal b...

Страница 33: ...reading pH Hydrion paper is inexpensive and obtainable from any chemical supply house or through your local druggist The pH should be higher than 7 but lower than 11 Add some of the washout chemical c...

Страница 34: ...nstructions outlined in Section IV Paragraphs A through K 10 Maintenance and Service Instructions continued WARNING This boiler contains controls which may cause the boiler to shut down and not restar...

Страница 35: ...brush clean front tube sheet Use care not to damage the insulation on the inside of the flue box Remove debris and vacuum as necessary e Replace turbulators and flue box door f Disconnect vent pipe f...

Страница 36: ...36 111079 01 12 20 FR Installation Service Manual Figure 11 1 Cleaning of FR Boiler 11 Boiler Cleaning continued...

Страница 37: ...sified as hazardous wastes in the United States and Canada First Aid Procedures If contact with eyes Flush with water for at least 15 minutes Seek immediate medical attention if irritation persists If...

Страница 38: ...t an air leak can have on CO2 readings 5 DIRT A fuel filter is a good investment Accidental accumulation of dirt in the fuel system can clog the nozzle or nozzle strainer and produce a poor spray patt...

Страница 39: ...tor relay is stuck closed see note below 2 Burner control will light then shut down after a short time then restart after one 1 minute a CAD cell is defective b Air leaking into oil line causing flame...

Страница 40: ...are illuminated and the control is installed on a standard immersion well this is false reading caused by a loss of continuity between the sensor and the inside of the well tube Follow steps 1 and 2 a...

Страница 41: ...l times when the control is powered Check for 120 VAC on terminals L1 and L2 YES Is the Red LED LOW WATER On YES NO Is the Yellow LED HI TEMP On YES The Control is Sensing High Temperature The burner...

Страница 42: ...ntinue to fire when there is a call from the thermostat or external zone Is the External Zone ZC ZR Calling for Heat YES The Control is Operating Normally NO Is the Low Limit Dial NO Set to OFF Check...

Страница 43: ...rker Wholesale distributor Should you require assistance in locating a New Yorker distributor in your area or have questions regarding the availability of New Yorker products or repair parts please co...

Страница 44: ...Installation Service Manual NOTE When ordering parts always give the serial number and model number shown on the boiler Also provide the name of the part s shown below FR Bare Boiler Repair Parts 13 S...

Страница 45: ...urner Door Assembly Includes Hardware N 109 111121 01 1 N 112 1 N 125 111123 01 1 1 N 132 1 1 1E Turbulator N 109 111125 01 11 N 112 12 N 125 18 18 N 132 111128 01 18 18 1F Combustion Chamber Insulati...

Страница 46: ...Stat 3250 Plus Cold Start 111133 01 1 1 1 1 1 1 Warm Start 111134 01 1 1 1 1 1 Electro Well 3 4 NPT x 4 110556 01 1 1 1 1 1 1 Relief Valve Conbraco 10 407 05 30PSI Obtain Locally 1 1 1 1 1 1 6 Draft R...

Страница 47: ...9 0 65 x 60W Delavan Loose 1 10 0 140 FRHGS 1 00 0 85 x 60B Hago Installed 9 1 FR 122 FR 122E 1 00 V 1 1 69 0 85 x 60A Delavan Installed 9 0 0 170 FR 147 FR147 1 25 V 1 1 69 1 00 x 60B Hago Installed...

Страница 48: ...eturn piping as shown below LWCO Location Select the appropriate size tee using the LWCO manufacturer s instructions Often the branch connection must have a minimum diameter to prevent bridging betwee...

Страница 49: ...ided piping and wiring connections and instructions to allow for this application How to Test Shut off fuel supply Lower water level until water level is BELOW the LWCO Generate a boiler demand by tur...

Страница 50: ...50 111079 01 12 20 FR Installation Service Manual SERVICE RECORD SERVICE PERFORMED DATE...

Страница 51: ...51 111079 01 12 20 FR Installation Service Manual SERVICE RECORD SERVICE PERFORMED DATE...

Страница 52: ...52 111079 01 12 20 FR Installation Service Manual...

Отзывы: