
41
110772-01 - 5/20
CL
Installation & Service Manual
Table 14-1: Becket
14
Burner Specifications
Boiler
Model
Firing Rate
GPM
Burner
Model
Settings
Nozzle
Shipped
Pump
Pressure
Head
(Setting)
Air
Shutter
Air
Band
CL3-105SE
0.75
AFG
L1
10
2
0.65 x 60B (Hago)
Installed
140
CL3-140SE
1.00
5
2
0.85 x 60B (Hago)
Field
Provided
CL4-168SE
1.20
V1(0)
10
0.5
1.00 x 60B (Hago)
Installed
CL4-210SE
1.50
10
6
1.25 x 60B (Hago)
Field
Provided
CL5-245SE
1.75
V1(3)
6
6
1.50 x 45B (Hago)
Installed
175
CL5-266SE
1.90
V1(4)
8
4
1.35 x 45B (Hago)
Field
Provided
Boiler
Model
Firing Rate
Burner
Model
Settings
Nozzle
Shipped
Pump
Pressure
Head Bar Air Band
CL3-105SE
0.75
EZ-1 HP
0.60/.065
0.6
0.65 x 60A (Delavan)
Installed
150
CL3-140SE
1.00
085/1.00
0.75
0.85 x 60B (Delavan)
Field
Provided
CL4-168SE
1.20
1.10/1.10
1.00 x 60A (Delavan)
Installed
CL4-210SE
1.50
1.10/1.25 1.25/1.35
1.25 x 60B (Delavan)
Field
Provided
CL5-245SE
1.75
EZ-2 HP
1.5
1.75
1.50 x 60A (Delavan)
Installed
CL5-266SE
1.90
Table 14-2: Carlin
Содержание CL3-105SE
Страница 34: ...34 110772 01 5 20 CL Installation Service Manual This Page is Intentionally Blank...
Страница 36: ...36 110772 01 5 20 CL Installation Service Manual Bare Boiler Assembly 13 Service Parts continued...
Страница 38: ...38 110772 01 5 20 CL Installation Service Manual CL Steam Boilers Trim and Controls 13 Repair Parts continued...