New Yorker CL3-105SE Скачать руководство пользователя страница 30

30

110772-01 - 5/20

CL

Installation & Service Manual

A.  CLEAN  THE  FLUEWAYS (See Figure 11-1).

1.  Prior to cleaning boiler, lay a protective cloth 

or plastic over combustion chamber blanket 

to collect debris falling from flueways.  Several 

models 

DO NOT

 utilize a combustion chamber 

blanket, see Section XIV, Repair Parts, Item 1 

Bare Boiler Assembly for details.

2.  For access to combustion chamber remove 

two (2) 5/16" - 18 cap screws, one on the right 

(1¼" long) and one on the left (3¼" long).  If 

boiler is equipped with flexible fuel line(s), 

swing door open.

3.  For cleaning from the top:

a.  Remove as much vent pipe as necessary 

to allow removal of the jacket top panel and 

canopy.

b.  Remove the jacket top panel.
c.  Remove the canopy, being careful not to 

damage the gasket.

4.  Using a 1¼” diameter wire or fibre bristle brush 

(30” handle) clean the flueways. Brush from the 

top    and/or side using horizontal and diagonal 

strokes for best results.

 

DO NOT

 

allow brush to 

strike the target wall or liner in the chamber.

B.  CLEAN  TOP  OF  BOILER  SECTIONS 
 

Brush and vacuum the tops of the boiler sections.

C.  CLEAN  THE  COMBUSTION  CHAMBER.

 

Using wire or fibre bristle brush, clean crown of 

boiler and inside of water legs. 

 

  WARNING

      

DO NOT allow brush to strike target wall or 

blanket in the combustion chamber.

D.  AFTER  CLEANING, 

 

remove protective cloth or 

plastic with debris and vacuum as necessary, but 

be careful not to damage blanket.  Inspect target 

wall, combustion chamber blanket, burner swing 

door insulation, and rope gasket for signs of 

damage.  If damaged, replace as needed.

E.  REASSEMBLE  BOILER.

CAUTION

      

DO NOT start the burner unless canopy, vent 

pipe, burner swing door and all flue cover 

plates are secured in place.

1.  Install the canopy taking care to align the 

gasket without blocking the flueways. If gasket 

is damaged, replace as needed.

2.  Reinstall jacket top panel with #8 x ½" long 

sheet metal screws.

3.  Reinstall vent pipe on canopy and secure to 

collar with sheet metal screws.

4.  Close burner swing door.  Secure door to front 

section with 5/16" flange nut and washer (right 

side) and 5/16" x 3½" lg. bolt (left side).

NOTICE 

When securing burner swing door make sure 

door is drawn-in equally on both sides.

  Tighten swing door hardware to provide 

adequate seal to rope gasket around perimeter 

of door.

  Use an alternating tightening method from right 

side flange nut to left side cap screw to pull 

door tight equally.

11

 Boiler Cleaning

  WARNING

       

All boiler cleaning must be completed with burner service switch turned off.  Boilers equipped with burner 

swing door have a potential hazard which can cause severe property damage, personal injury or loss of 

life if ignored.  Before opening swing door, turn off service switch to boiler to prevent accidental firing of 

burner outside the combustion chamber.  Be sure to tighten swing door fastener completely when service is 

completed.

!

!

!

Содержание CL3-105SE

Страница 1: ...team Boiler Natural Draft Oil Fired Models CL3 105SE CL3 140SE CL4 168SE CL4 210SE CL5 245SE CL5 266SE CL3 105SET CL3 140SET CL4 168SET CL4 210SET CL5 245SET CL5 266SET Manual Contents Page 1 Product...

Страница 2: ...liances For Venting requirements places Vents and Solid Fuel Burning Appliances For Venting requirements C Current Edition of American Society of Mechanical Engineers ASME CSD 1 C Current Edition of A...

Страница 3: ...ation is complete including verifying that the limit sensor is fully installed seated in bottom of Well Failure to properly install Limit Sensor may result in property damage personal injury or loss o...

Страница 4: ...rovisions for adequate combustion and ventilation air A clean and unobstructed chimney flue is necessary to allow noxious fumes that could cause injury or loss of life to vent safely and will contribu...

Страница 5: ...oiler is a cast iron oil fired low pressure steam boiler designed for use in closed heating steam systems This boiler must be vented by natural draft into a fireclay tile lined masonry chimney or chim...

Страница 6: ...6 110772 01 5 20 CL Installation Service Manual Figure 1 3 Steam Boiler with or without Tankless Heater A B C DIA 1 Product Description Specification and Dimensional Data continued...

Страница 7: ...ATION provide a solid elevated base such as concrete if floor is not level or if water may be encountered on floor around boiler 4 PROVIDE SERVICE CLEARANCE of at least 24 clearance from front jacket...

Страница 8: ...free area of 1 square inch per 4 000 BTU per hour input of all equipment in space Duct cross sectional area shall be same as opening free area iii Horizontal ducts Minimum free area of 1 square inch...

Страница 9: ...r for steam piping consider the following characteristics of copper piping 1 high coefficient of thermal expansion can induce mechanical stresses and cause expansion contraction noises if not accounte...

Страница 10: ...Figure 3 1 Recommended Boiler Piping for Gravity Return Steam Boiler NOTICE Failure to pipe boiler as specified in this manual may result in excessive system noise water line fluctuations and water ca...

Страница 11: ...r to prevent lime formation in the valve Refer to Figure 4 1 3 FLUSHING OF HEATER All water contains some sediment which settles on the inside of the coil Consequently the heater should be periodicall...

Страница 12: ...ess Heater Piping Table 4 2 Tankless Heater Data Boiler Series Rating Gal Min Pressure Drop PSI CL3 105SE T 3 00 4 7 CL3 140SE T 3 25 5 6 CL4 168SE T 3 75 7 2 CL4 210SE T 4 00 8 0 CL5 245SE T 4 25 8 8...

Страница 13: ...c Water Heater Piping with V8H Steam Boiler B CONNECT INDIRECT DOMESTIC WATER HEATER PIPING as shown in Figure 4 3 1 Refer to Indirect Water Heater Installation Operating and Service Instructions for...

Страница 14: ...integrity as well as for proper draft and condensate control Some jurisdictions require the use of a liner when changing fuel types Some jurisdictions require the use of a liner even when the same fue...

Страница 15: ...15 110772 01 5 20 CL Installation Service Manual Figure 5 2 Proper and Improper Locations of Draft Regulator Figure 5 1 Recommended Vent Pipe Arrangement and Chimney Requirements 5Venting continued...

Страница 16: ...in a vertical chimney as well as the propensity to create condensate The higher the stack temperature the greater the amount of draft that can be generated A lower stack temperature not only reduces t...

Страница 17: ...r is turned off A GENERAL 1 Install wiring and electrically ground boiler in accordance with requirements of the authority having jurisdiction or in absence of such requirements the National Electrica...

Страница 18: ...18 110772 01 5 20 CL Installation Service Manual Figure 6 1 Schematic Wiring Diagram Steam Boiler McDonnell Miller PSE 801 Probe LWCO All Burner Options 6 Electrical continued...

Страница 19: ...19 110772 01 5 20 CL Installation Service Manual Figure 6 2 Schematic Wiring Diagrams For All Burner Options w Various Oil Primary Controls 6 Electrical continued...

Страница 20: ...ll not be smaller than 3 8 iron pipe or 3 8 OD copper tubing Copper tubing shall have a 032 minimum wall thickness WARNING Under no circumstances can copper with sweat style connectors be used NOTICE...

Страница 21: ...ch and 1 2 inch OD tubing for both suction and return lines Refer to Figure 7 4 Lift H See Fig 25 Maximum Length of Tubing H R See Figure 27 3 8 OD Tubing 3 GPH 1 2 OD Tubing 3 GPH 0 93 100 2 85 100 4...

Страница 22: ...ressure refer to Tables 14 1 and 14 2 at the rear of this manual A ALWAYS INSPECT INSTALLATION BEFORE STARTING BURNER 1 Verify that the venting water piping oil piping and electrical system are instal...

Страница 23: ...rol has tripped the burner has experienced ignition failure Refer to Oil Primary Control features Paragraph I Step 2 of this Section and Section XV Troubleshooting Paragraph B If the failure re occurs...

Страница 24: ...utomatically restart during fill Lower thermostat setting f Check operating control on boiler applications equipped with tankless heater s With burner off draw hot water until burner starts then turn...

Страница 25: ...er included and there is no demand for heat the L4006A operating control will maintain the boiler water temperature at the selected setting for proper operation of the domestic water heater The probe...

Страница 26: ...sufficiently tight around potential entry points for RCF dust 3 Gloves 4 Eye protection such as goggles safety glasses with side shields or full facepiece Take steps to assure adequate ventilation Han...

Страница 27: ...pipe threads of the probe to remove old hardened pipe dope and other foreign matter i Apply a moderate amount of good quality pipe dope to the pipe threads on the probe leaving the two end threads ba...

Страница 28: ...penings in supply main ii Draw about 5 gallons of hot water from boiler into a container and dissolve into it the appropriate amount of a recommended boilout compound Remove safety valve from boiler a...

Страница 29: ...ea gets extremely hot and eventually cracks The presence of free oxygen or chloride salts in the boiler corrodes the cast iron from the inside More make up water and higher concentrations of contamina...

Страница 30: ...ic with debris and vacuum as necessary but be careful not to damage blanket Inspect target wall combustion chamber blanket burner swing door insulation and rope gasket for signs of damage If damaged r...

Страница 31: ...he boiler is connected to a dirty or inadequate chimney The interior of the chimney flue must be inspected and cleaned before the start of the heating season and should be inspected periodically throu...

Страница 32: ...t an air leak can have on CO2 readings 5 DIRT A fuel filter is a good investment Accidental accumulation of dirt in the fuel system can clog the nozzle or nozzle strainer and produce a poor spray patt...

Страница 33: ...relay is stuck closed see note below 2 Burner control will light then shut down after a short time then restart after one 1 minute a CAD cell is defective b Air leaking into oil line causing flame ou...

Страница 34: ...34 110772 01 5 20 CL Installation Service Manual This Page is Intentionally Blank...

Страница 35: ...tributors Should you require assistance in locating a New Yorker Distributor in your area or have questions regarding the availability of New Yorker products or repair parts please contact New Yorker...

Страница 36: ...36 110772 01 5 20 CL Installation Service Manual Bare Boiler Assembly 13 Service Parts continued...

Страница 37: ...mplete Block Assembly Target Wall Insulation 110781 03 1 110781 04 1 110781 05 1 1B Canopy Includes Canopy Canopy Gasket and Hardware 110554 03 1 110554 04 1 110554 05 1 1C Canopy Gasket 110272 01 1 1...

Страница 38: ...38 110772 01 5 20 CL Installation Service Manual CL Steam Boilers Trim and Controls 13 Repair Parts continued...

Страница 39: ...7 8 Lg 109707 01 1 1 1 2C Honeywell PA404A1009 Pressuretrol w Syphon 110782 01 1 1 1 2D 10 1 4 Gauge Glass Set 110783 01 1 1 1 2E McDonnell Miller PSE801 120 LWCO with Probe and Harness 110784 01 1 1...

Страница 40: ...ts continued Item No Description Part No CL3 CL4 CL5 Not Shown Beckett 110498 03 1 110499 04 1 110500 05 1 Carlin 110496 03 1 110497 04 1 106862 01 1 Primary Control Honeywell R7284P1080 103880 01 1 1...

Страница 41: ...6 1 25 x 60B Hago Field Provided CL5 245SE 1 75 V1 3 6 6 1 50 x 45B Hago Installed 175 CL5 266SE 1 90 V1 4 8 4 1 35 x 45B Hago Field Provided Boiler Model Firing Rate Burner Model Settings Nozzle Ship...

Страница 42: ...r return piping as shown below LWCO Location Select the appropriate size tee using the LWCO manufacturer s instructions Often the branch connection must have a minimum diameter to prevent bridging bet...

Страница 43: ...s provided piping and wiring connections and instructions to allow for this application How to Test Shut off fuel supply Lower water level until water level is BELOW the LWCO Generate a boiler demand...

Страница 44: ...44 110772 01 5 20 CL Installation Service Manual New Yorker Boiler Company Inc P O Box 3005 Lancaster Pennsylvania 17603 3005 Attn Customer Service Department www newyorkerboiler com...

Отзывы: