- 53 -
NL4500G4 TRIDENT
www.New-Leader.com
(800) 363-1771
313974-AA-B
Header
1. Make sure unit has been properly serviced and is in good operating condition. It is recommended to
run the spreader prior to loading material to ensure acceptable operation.
2. Set manual machine settings in controller per Controller section in this manual.
3. Program controller with correct data for material and application.
4. Adjust feedgate to appropriate setting.
5. Adjust spinner to give spread pattern desired. See “Spread Pattern” and “Controller” sections for
details. Calibrate and spread pattern test for any new material.
6. Fill unit with material to be spread.
7. Engage hydraulics.
8. Begin spreading.
CAUTION
Drive only at speeds which permit good control of vehicle!
General Operating Procedures
Visit
http://newleader.highwayequipment.com/calculators/yield-output
for interactive
tools to calculate yield, proper feedgate opening, conveyor revolutions per minute, and
mph to maximize the performance of your spreader.
Содержание NL4500G4
Страница 6: ...Insert Current New Leader Warranty Warranty...
Страница 54: ...54 www New Leader com 800 363 1771 313974 AA B NL4500G4 TRIDENT Notes This page is intentionally left blank...
Страница 76: ...76 www New Leader com 800 363 1771 313974 AA B NL4500G4 TRIDENT Header MultApplier Only Hydraulic Schema c...
Страница 82: ...82 www New Leader com 800 363 1771 313974 AA B NL4500G4 TRIDENT Notes This page is inten onally le blank...
Страница 138: ...138 www New Leader com 800 363 1771 313974 AA B NL4500G4 TRIDENT Notes This page is intentionally left blank...
Страница 152: ...152 www New Leader com 800 363 1771 313974 AA B NL4500G4 TRIDENT Notes This page is intentionally left blank...