
- 61 -
3� Verify task control in Target Rate 1�
• Rate will be driven by job setup in display� To verify
this, TC should show in place of target rate 1� If
not, verify job has been created correctly� Refer to
display manual�
4� Verify total spread width and spinner speed:
• Different products may require different spread
widths or spinner speeds� Always verify the
material profile is configured correctly before
applying product�
•
Edit current profile or create a new one if
necessary. See “Material Profile Management” for
details�
• Enable Spinner Circuit� Using keypads, enter
Spinner Speed and Total Spread Width� If desired,
enter Spinner Offset (see Boundary Spreading
section of this manual for instructions)�
5� Verify gate opening:
• Press
to set bin levels and
change gate opening�
Controller Operations
Содержание L5034G4 AGCO
Страница 5: ...5 L5034G4 AGCO www NewLeader com 800 363 1771 306375 AA E This page is intentionally left blank Notes...
Страница 6: ...Insert Current New Leader Warranty Warranty...
Страница 37: ...37 L5034G4 AGCO www NewLeader com 800 363 1771 306375 AA E Troubleshooting Hydraulic Schematic...
Страница 76: ...76 Notes This Page Intentionally Left Blank...