INTRODUCTION
3. 4–bolt flange connections conforming to ISO 6162-1 and SAE J518-1 (Code 61) and to
ISO 6162-2 and SAE J518-2 (Code 62):
NOTE:
Torque values according ISO 6162:
– It is important that all screws be lightly torqued before applying the final recommended torque values to avoid break-
ing the split flange clamps or one-piece flange clamps during installation.
– Calculated with a coefficient of friction at 0.17.
SS14G153
3
Position
Designation
1
Shape optional
2
O-ring
3
Flange clamp
4
Flanged head
5
Screw
6
Hardened washer
7
Face of port on adapter,
pump, etc.
Assembly:
A. Make sure sealing surfaces are free of burrs, nicks, scratches or any contamination.
B. Lubricate the O-ring lightly with system fluid or compatible lubricant.
C. Position flange and clamp halves.
D. Place lock washers on bolts and bolt through clamp halves.
E. Finger tighten all four bolts making certain the flange and fitting shoulder are started squarely. ALL BOLTS MUST
BE EVENLY TORQUED. Do not tighten any one bolt fully before going on to the next one. Partially tighten each
bolt as shown below and repeat this sequence until all bolts are tightened to the specified torque for that bolt size.
SS14G150
4
47829043 22/01/2015
21
Содержание F106.8
Страница 7: ...47829043 22 01 2015 Find manuals at https best manuals com ...
Страница 8: ...INTRODUCTION 47829043 22 01 2015 1 Find manuals at https best manuals com ...
Страница 22: ...INTRODUCTION Markings for Grade 12 9 hardware 47829043 22 01 2015 15 ...
Страница 51: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com ...