2
Temporarily remove top outer gear by pulling the two locking tabs away
from the top inner gear. This will protect the top outer gear from possible
damage when driving the EZ Mount anchor pipe into the ground.
Drive the EZ Mount anchor pipe into the ground using a sledge hammer
(10-pound / 4.5kg hammer is preffered; 5-pound / 2.25kg hammer will
suffice; claw hammer is not adviceable).
To ensure the pipe is straight and plumb, place a bubble level and check
pipe every 3-4 swings.
Drive the pipe until the top of the pipe is approximately 24 in ( 61 cm)
in height and the bottom inner gear is touching the ground as shown.
Center and lock the top outer gear to the top inner gear”.
Take note of the 2 3/8” (6 cm) measurement below. This will be the
height of which a fastening screw will be installed. In case your dimension
is different, please measure and write the value down for future reference.
EZ Mount Anchor Installation
1
2
3
STEP O N E
4
www.newenglandarbors.com
www.newenglandarbors.co.uk
1
±24 in
61 cm
±2 3/8 in
6 cm
4
3
4x4 Lamp Post with EZ Mount Instructions
Temporarily
remove the top
outer gear.