FINISHING YOUR FIREBOX 

There is a wide variety of finishing material 
available for your firebox from formal wall 
treatments with marble and mantels, to rustic 
wood paneling, stone or brick. 

IT IS IMPORTANT THAT THE BLACK FACE 
OF THE FIREBOX NOT BE COVERED WITH 
ANY TYPE OF COMBUSTIBLE MATERIAL. 

Non-combustible facing materials such as 
marble, brick, or ceramic tile may overlap the 
black face of the firebox up to the opening on 
either side of the firebox.  Seal all joints 
between the black firebox face and the wall 
covering with a heat-resistant material such as 
rock wool insulation or mortar.  Be sure to 
use high temperature adhesive or mortar when 
anchoring brick, stone, or tile to the face of 
the firebox.  Check to see whether man-made 
brick and stone are made of non-combustible 

materials before using them on the face of the 
firebox.  Some of these products contain 
combustible materials.  Combustible wall 
coverings such as paneling or wallboard may 

not 

overlap the black face of the firebox.  The 

space between the wall covering and the 
firebox should be sealed with a heat resistant 
material such as rock wool insulation or 
mortar. 

NOTE:

  

An “L” shaped steel lintel must be 

installed across the top of the firebox 
opening where facing materials such as 
brick or stone is used on the face of the 
firebox.  It acts as a support/firestop.  It 
should be attached to the face of the firebox 
with screws and sealed to the firebox with a 
heat-resistant sealer.

 

CLEARANCES 

To ensure a safe installation, the following 
must be carefully observed. 
1. 

Sidewall Clearances:

  Clearances from 

the side of the firebox opening to any 
adjacent combustible wall should not be 
less than 7".  See Figure 4 

2. 

Ceiling Clearances:

  The ceiling height 

should not be less than 42" from the top 
of the firebox opening. 

 

3.  

Mantel Clearances:

   See Figure 5. 

Non-combustible materials used in 
this installation such as slate, tile, 
marble, etc. must be at least 1/2" 
thick. 
4. 

Floor Clearances:

    No 

clearance is required if the 
appliance is installed per these 
instructions. 

 

42" MIN.

CLEARANCE

TO CEILING

7" MIN.

FIGURE 4

SIDE WALL

CLEARANCE

FROM FIREPLACE

OPENING TO SIDE WALL

FRONT 

24” CLEARANCE FROM THE FIREBOX OPENING 

LEFT 

RIGHT 

8

Содержание Buck Stove ZCBB

Страница 1: ...RSAL BOX Carefully review the instructions supplied with the decorative type unvented room heater for the minimum fireplace size requirement DO NOT INSTALL AN APPLIANCE IN THIS FIREBOX UNLESS THIS FIR...

Страница 2: ......

Страница 3: ...FF 7 Finishing Your Firebox 8 Mantel Profiles For Zero Clearance 9 Optional Wooden Flush Mount Mantel Front FF 10 Optional Wooden Surround WS 11 Producing Adequate Ventilation 13 Ventilation Air from...

Страница 4: ...2...

Страница 5: ...state or local codes After Market Completion of sale not for purpose of resale from the manufacturer 3 This heater shall not be installed in a confined space or unusually tight construction unless pr...

Страница 6: ...0 for Producing Adequate Ventilation NOTE THIS IS A VENTLESS FIREBOX ENCLOSURE UNIVERSAL FOR GAS FIRED DECORATIVE TYPE UNVENTED ROOM HEATERS IT WILL ACCEPT ANY GAS LOGS UP TO 40 000 BTU S AS LONG AS T...

Страница 7: ...n may be best where space is limited Your Ventless Firebox Enclosure weighs no more than some of your fine furniture If the firebox is located near a load bearing wall additional supports to the found...

Страница 8: ...TORY INSTALLED CANOPY IT MAY NOT BE REPLACED WITH ANY OTHER MANUFACTURER S CANOPY 39 3 8 35 1 2 20 1 4 11 1 4 39 3 8 20 1 2 36 3 16 38 1 8 38 1 8 40 7 8 WARNING NOTCHING OF THE FRAMING AROUND THE STAN...

Страница 9: ...L BUILDING CODES SHOULD BE CONSULTED IN ALL CASES AS TO THE PARTICULAR REQUIREMENTS CONCERNING THE INSTALLATION OF FACTORY BUILT FIREBOXES Select the location for the firebox by taking into considerat...

Страница 10: ...irebox The space between the wall covering and the firebox should be sealed with a heat resistant material such as rock wool insulation or mortar NOTE An L shaped steel lintel must be installed across...

Страница 11: ...NIVERSAL BOX ZERO CLEARANCE CABINET MUST BE FOLLOWED A 3 3 4 3 1 2 4 B CANOPY STANDOFF COMBUSTIBLE MATERIALS ZCBB MANTEL CLEARANCES MANTEL WIDTH MANTEL HEIGHT A inches B inches above firebox opening 6...

Страница 12: ...e page 8 figure 4 2 Ceiling Clearances The ceiling height should not be less than 42 from the top of the firebox opening INSTALLATION INSTRUCTIONS 1 After removing the FF kit from its packaging follow...

Страница 13: ...dium Phillips Screwdriver Step 1 Lay out all components See diagram 1 Step 2 Assemble end panels A B to top front rail C Step 3 Stand end panels and top front rail onto base hearth and fasten down wit...

Страница 14: ...ear of the WS this gives you more area to hold the ZCBB and reduces the risk of scratching the surface of the front area of the base hearth area Flush and center the ZCBB s front in the WS You can att...

Страница 15: ...ERMINE IF YOU HAVE A CONFINED OR UNCONFINED SPACE Use this worksheet to determine if you have a confined or unconfined space SPACE Include the room in which you will install heater plus adjoining room...

Страница 16: ...____BTU Hr actual amount of BTU Hr used Example 51200 BTU Hr maximum the space can support 58000 BTU Hr actual amount of BTU Hr used The space in the above example is a confined space because the actu...

Страница 17: ...and 2 Figure 6 You can also remove door into adjoining room see Option 3 Figure 6 WARNING REWORK WORKSHEET ADDING THE SPACE OF THE ADJOINING UNCONFINED SPACE THE COMBINED SPACES MUST HAVE ENOUGH FRESH...

Страница 18: ...nings one within 12 of the ceiling and one within 12 of the floor Connect these items directly to the outdoors These spaces include attics and crawl spaces Follow the National Fuel Gas Code NFPA 54 AN...

Страница 19: ...Connect the black power cord wire to the 24 jumper wire provided then attach the jumper wire to the middle terminal on the ON OFF switch Next connect the remaining thermostat wire to 1 of the wires co...

Страница 20: ...d be done by a qualified service person This heater should be inspected before use and at least annually by a qualified service technician More frequent cleaning may be required due to excessive lint...

Страница 21: ...ANOPY 7 DOOR KIT PART MAZCBBDOORS PARTS MAY BE OBTAINED THROUGH YOUR LOCAL NBC DEALER IN ABSENCE OF A DEALER PLEASE CONTACT NEW BUCK CORPORATION AT P O BOX 69 8000 HWY 226 SOUTH SPRUCE PINE NC 28777 O...

Страница 22: ...parts that are not in original condition normal wear and tear or parts that fail or become damaged as a result of misuse accidents lack of proper maintenance or defects caused by improper installatio...

Отзывы: