NV-700I Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. A.5
25
NV-700I is designed to enhance EMS performance by grounding. NV-700I come with metal DIN-Rail brackets for grounding the
switches. For optimal EMS performance, connection of the right of the NV-700I side panel ground lug to the grounding point.
Before user installed power and device, please read and follow these essentials:
Use separate paths to route wiring for power and devices. If power wiring and device wiring paths must cross, make sure the
wires are perpendicular at the intersection point.
Note:
Do not run signal or communications wiring and power wiring through the same wire conduit. To avoid interference, wires with
different signal characteristics should be routed separately.
You can use the type of signal transmitted through a wire to determine which wires should be kept separate. The rule of thumb
is that wiring sharing similar electrical characteristics can be bundled together.
You should separate input wiring from output wiring.
We recommend that you mark all equipment in the wiring system.
Содержание NV-700I
Страница 38: ...NV 700I Managed Industrial VDSL2 CO CPE Modem USER S MANUAL Ver A 5 37...
Страница 57: ...NV 700I Managed Industrial VDSL2 CO CPE Modem USER S MANUAL Ver A 5 56 Figure 4 6 3 IPv6Static Route...
Страница 62: ...NV 700I Managed Industrial VDSL2 CO CPE Modem USER S MANUAL Ver A 5 61 Figure 4 7 2 Add Traffic type Settings...
Страница 63: ...NV 700I Managed Industrial VDSL2 CO CPE Modem USER S MANUAL Ver A 5 62 Figure 4 7 2 Add Flow Settings...
Страница 74: ...NV 700I Managed Industrial VDSL2 CO CPE Modem USER S MANUAL Ver A 5 73 Select OID 1 3 6 1 2 1 1 3 SysUp Time...